# Licensing in Camden

> Camden has additional HMO licensing across the whole council area.

Scheme statuses as of 28 November 2026.

- Checked 24 Nov 2026 (researched_at 2026-11-24, verified_at 2026-11-24)
- Region: London
- ONS code: E09000007
- Web page: https://lettance.com/councils/camden
- API: https://lettance.com/api/v1/councils/camden

## Licensing schemes

### Additional HMO licence: London Borough of Camden Council Designation for an Area for Additional Licensing of Houses in Multiple Occupation 2025

- Status: In force (`in_force`)
- Area: The whole district of the London Borough of Camden.
- Runs: 8 December 2025 to 7 December 2030
- Fee: Published standard fee: £1,570. From 15 Jan 2026 (HMO licensing fees 2026/27), new and renewal fees are the same. Section 254 HMOs: Part 1 £1,318 + Part 2 £252, totalling £1,570. Purpose-built student accommodation: £1,318 + £65, totalling £1,383. Accredited private landlords who own the property and are the proposed licence holder get £100 off Part 2; companies and managing agents do not qualify. A renewal must be made within the 30 days before expiry and cannot be made after expiry. Licences are generally 5 years but may be cut to 2 years with no fee reduction. The current HMO page also links an older one-year-licence factsheet; confirm any reduced term on the individual licence rather than assuming that the fee schedule resolves that conflict.
- Licence length: 5 years
- Who needs one: All section 254 HMOs occupied by 3 or more people forming 2 or more households, where not subject to mandatory licensing. This includes HMO flats in purpose-built blocks of 3 or more flats. Section 257 converted buildings are recorded separately under the same designation.
- Exemptions: Annex C / Schedule 14 buildings (not HMOs for licensing purposes), HMOs under interim or final management orders, HMOs with a temporary exemption notice (s62), and HMOs requiring a mandatory licence. Applications for properties with no tenants may be returned, because a property is not an HMO until occupied.
- Apply: https://hmolicense.camden.gov.uk/PSH/ServiceRequests/Default/MyServicesLogin
- Licence conditions: https://www.camden.gov.uk/documents/d/guest/updated-licence-conditions-for-25-30-designation
- Council's map or designation: https://www.camden.gov.uk/documents/d/guest/additional-hmo-licensing-designation-sealed
- Confidence: High
- How we checked this: This renews Camden's borough-wide additional licensing, which has operated since 2015. The designation was made on 2 July 2025 under the 2024 General Approval, after a consultation with over 800 responses and 58% support. The council's renewal announcement describes new waste-management conditions and two-year licences where management or property conditions cause concern. The public notice gives 8 December 2025 as commencement and 8 December 2030 as cessation; the latter is the fifth anniversary, so the last day in force is 7 December 2030. The public notice retains pre-RRA penalty and rent-repayment wording; the separate current civil-penalty policy is the source for local enforcement policy. The notice expressly includes section 257 converted blocks with less than half owner-occupation, shown separately here to preserve their building-level eligibility warning. The Cabinet Member for Better Homes took the renewal decision on 24 June 2025, effective 2 July 2025 (decision 4785, read on 24 November 2026). On 24 November 2026 the current HMO page, public notice, sealed designation (including its Annex A map), fee schedule, conditions, renewal announcement and penalty policy were re-read directly from www.camden.gov.uk. No current selective designation was established in the checked sources; that is a bounded research finding, not proof of absence.
- Sources: https://www.camden.gov.uk/hmo-consultation-public-notice, https://www.camden.gov.uk/houses-multiple-occupation, https://www.camden.gov.uk/hmo-consultation, https://www.camden.gov.uk/documents/d/guest/hmo-licensing-application-fees-2026-2027, https://www.camden.gov.uk/documents/d/guest/additional-hmo-licensing-designation-sealed, https://news.camden.gov.uk/have-your-say-on-hmo-licensing-in-camden/, https://news.camden.gov.uk/camden-renews-hmo-licensing-scheme-to-drive-up-housing-standards-for-private-renters/, https://prod-web-assets.camden.gov.uk/houses-multiple-occupation, https://prod-web-assets.camden.gov.uk/hmo-consultation-public-notice, https://www.camden.gov.uk/documents/d/guest/updated-licence-conditions-for-25-30-designation, https://democracy.camden.gov.uk/ieDecisionDetails.aspx?ID=4785

### Additional HMO licence: Camden additional HMO licensing 2025-2030 (section 257 converted buildings)

- Status: In force (`in_force`)
- Area: The whole district of the London Borough of Camden.
- Runs: 8 December 2025 to 7 December 2030
- Fee: Published standard fee: £1,570. The council's 2026/27 fee schedule separately lists "Converted building into flats (section 257)" for new and renewal applications: Part 1 £1,318 plus Part 2 £252, total £1,570, effective 15 January 2026. This is the converted-building application row, not a per-flat or per-bedroom tariff. The £100 Part 2 accreditation discount requires a private landlord who owns the property, is the proposed licence holder and supplies current accreditation; companies and managing agents do not qualify. Confirm any separately licensable HMO flat's application and any individual reduced licence term with Camden.
- Licence length: 5 years
- Who needs one: Section 257 HMOs: buildings converted into self-contained flats that do not meet the appropriate building standards, where less than half of the flats are owner-occupied. This is the building-level component of the borough-wide 2025 designation, not a requirement for every individual self-contained flat.
- Check the property: Check the building as a whole: it must be a section 257 converted block whose conversion did not and still does not meet the appropriate Building Regulations standards (1991 or later, as applicable), and less than half of its flats must be owner-occupied under Camden's designation. A postcode and household count in one flat cannot establish these facts.
- Exemptions: Annex C / Schedule 14 buildings (not HMOs for licensing purposes), HMOs under interim or final management orders, HMOs with a temporary exemption notice (s62), and HMOs requiring a mandatory licence. Applications for properties with no tenants may be returned, because a property is not an HMO until occupied.
- Apply: https://hmolicense.camden.gov.uk/PSH/ServiceRequests/Default/MyServicesLogin
- Licence conditions: https://www.camden.gov.uk/documents/d/guest/updated-licence-conditions-for-25-30-designation
- Council's map or designation: https://www.camden.gov.uk/documents/d/guest/additional-hmo-licensing-designation-sealed
- Confidence: High
- How we checked this: The converted-building part of the existing 2025 borough-wide additional designation is shown separately from ordinary shared houses and flats. Paragraph 5 of the current council public notice explicitly includes section 257 HMOs only where less than half of the flats are owner-occupied; do not substitute the broader national section 257 two-thirds threshold. The designation dates and exemptions are the same as the shared-HMO component: in force 8 December 2025, ceases 8 December 2030 on its fifth anniversary, so the last day in force is 7 December 2030. The 2026/27 schedule explicitly prices converted-building applications separately. Occupation of one flat by a single household does not establish whether the building as a whole needs this licence. The sealed designation was visually inspected on 24 November 2026: Annex B applies it to section 257 HMOs 'where less than half of the flats are owner-occupied' and says section 257(2)(b) 'should be read as if it says less than half of the self-contained flats are owner-occupied'. Annex A shows the whole borough edged black on a council ward map created on 2 May 2023.
- Sources: https://www.camden.gov.uk/hmo-consultation-public-notice, https://www.camden.gov.uk/houses-multiple-occupation, https://www.camden.gov.uk/documents/d/guest/hmo-licensing-application-fees-2026-2027, https://www.camden.gov.uk/documents/d/guest/additional-hmo-licensing-designation-sealed, https://prod-web-assets.camden.gov.uk/houses-multiple-occupation, https://prod-web-assets.camden.gov.uk/hmo-consultation-public-notice, https://www.camden.gov.uk/documents/d/guest/updated-licence-conditions-for-25-30-designation

### Mandatory HMO licence: Mandatory HMO licensing (Housing Act 2004 Part 2)

- Status: In force (`in_force`)
- Area: National scheme, applies across the whole borough.
- Fee: Published standard fee: £1,570. The same 2026/27 fee table applies to mandatory and additional licences: £1,570 (£1,318 + £252), or £1,383 for purpose-built student accommodation. Accredited private landlords get £100 off Part 2.
- Licence length: 5 years
- Who needs one: Most properties occupied by 5 or more people forming 2 or more households, regardless of storeys.
- Exemptions: HMO flats in purpose-built blocks of 3 or more flats are exempt from mandatory licensing, but in Camden they still need an additional licence.
- Apply: https://hmolicense.camden.gov.uk/PSH/ServiceRequests/Default/MyServicesLogin
- Licence conditions: https://www.camden.gov.uk/documents/d/guest/updated-licence-conditions-for-25-30-designation
- Confidence: High
- How we checked this: Included because the council publishes its own fee schedule covering mandatory licences.
- Sources: https://www.camden.gov.uk/houses-multiple-occupation, https://www.camden.gov.uk/documents/d/guest/hmo-licensing-application-fees-2026-2027, https://prod-web-assets.camden.gov.uk/houses-multiple-occupation, https://prod-web-assets.camden.gov.uk/hmo-consultation-public-notice, https://www.camden.gov.uk/documents/d/guest/updated-licence-conditions-for-25-30-designation

### Additional HMO licence: Camden additional HMO licensing designation 2020-2025 (previous scheme)

- Status: Ended (`expired`)
- Area: The whole borough.
- Runs: 8 December 2020 to 7 December 2025
- Fee: Not yet confirmed. Superseded. Fees for the old scheme were not recorded.
- Licence length: 5 years
- Who needs one: Borough-wide additional licensing of HMOs not covered by mandatory licensing. The exact scope of the 2020 designation, including its s257 criteria, was not re-verified.
- Confidence: High
- How we checked this: Included because it ended less than 12 months ago. The 2025 designation took over the same borough-wide coverage with no gap. The council's review (Oct 2024) says the scheme was implemented on 8 Dec 2020 'for a period of five years' and was 'due to expire on 8 December 2025'. Five years from 8 Dec 2020 ends on 7 Dec 2025, and the 2025 designation came into force on 8 Dec 2025, so end_date is 7 Dec 2025, the last day in force. Licences issued under it remain valid until they expire. Renewal applications are only accepted before the existing licence expires.
- Sources: https://www.camden.gov.uk/documents/d/guest/review-of-the-current-additional-hmo-licensing-scheme, https://www.camden.gov.uk/hmo-consultation, https://www.camden.gov.uk/houses-multiple-occupation

## Article 4 for house shares

We found no Article 4 direction on house shares in Camden.

No HMO (Class L, C3 to C4) Article 4 direction was established in the checked sources. GOV.UK's planning data register returned 21 Camden directions on 24 November 2026, as on 3 November: conservation-area householder directions, basements, two Kentish Town Road demolition directions, Class E to C3 inside and outside the CAZ, launderettes to C3, and the June 2026 non-immediate conservation-area directions. None is described as an HMO or Class L direction. The council's land-use Article 4 page (https://www.camden.gov.uk/article-4-directions-land-use-classes), read directly on 24 November 2026, lists only the Class E to C3 and launderette directions. The register's entry dates are March 2026 or earlier, so this is not proof that no later direction exists.

Council source: https://www.planning.data.gov.uk/entity/?dataset=article-4-direction&organisation_entity=90

## HMO register

The council's public register of licensed HMOs: https://opendata.camden.gov.uk/Housing/HMO-Licensing-Register/x43g-c2rf (checked 24 November 2026). It lists licensed HMOs only.

The council's open data site holds the HMO licensing register; its metadata gives a weekly update frequency and the rows were last updated on 21 November 2026.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has been updated for the Renters' Rights Act.

The policy is titled 'Policy - Civil penalties under the Renters' Rights Act 2025 and other housing legislation'. It was first issued on 8 Dec 2025, separated from the main enforcement policy, and updated on 30 Sep 2026 for the RRA penalties and maximums. The maximum is £40,000 for offences and £7,000 for lower-tier breaches. The matrix uses MHCLG statutory-guidance starting points: failure to obtain a selective licence £12,000 (£9,600 to £14,400 after the Landlord Type adjustment); failure to obtain an HMO licence £17,000 (£13,600 to £20,400). The Landlord Type adjustment is +20% (6+ properties ever, 3+ HMOs, corporate landlord or director, or significant experience) or -20% (2 or fewer properties, at most 1 HMO and very limited experience). Aggravating and mitigating factors are normally limited to +/-20%, with exceptional departures allowed by the policy, followed by financial considerations and totality. Starting points for HMO licence-condition breaches are grouped in Appendix 2. There is a 15% prompt-payment discount if the penalty is paid within the final-notice period (normally 28 days) and no appeal is lodged. The Executive Director Homes and Communities agreed the updated Enforcement and Civil Penalty Notice policies on 30 September 2026 (decision 5385, published 14 October 2026). The policy PDF was read directly on 24 November 2026; its version table records the 8 December 2025 issue and the 30 September 2026 RRA update.

Policy: https://www.camden.gov.uk/documents/d/guest/camden-civil-penalty-notice-policy-sep-26

## Consultations

- [Renewal of the borough-wide additional HMO licensing scheme (2025-2030)](https://news.camden.gov.uk/have-your-say-on-hmo-licensing-in-camden/): Approved. Closed 8 April 2025.

## Not yet confirmed

We could not settle these points when we researched Camden on 24 November 2026. Check them with the council before you rely on them.

- The 2020 designation itself was not read. Its end date remains 7 December 2025 from the council review's five-year wording from 8 December 2020 and the replacement designation's 8 December 2025 start; the exact previous section 257 scope remains unverified.
- Confirm any HMO-specific Article 4 direction made after the published register entries. The live GOV.UK register was read on 24 November 2026; its 21 entries have entry dates of 16 March 2026 or earlier, and the council's current land-use Article 4 page lists no HMO direction. These bounded sources do not guarantee absence of later decisions.
- No current selective licensing designation or proposal was established. On 24 November 2026 a council-site search for "selective licence" returned no results, the landlords and HMO pages describe no selective scheme, the democracy decisions register for 1 January to 24 November 2026 contains no licensing designation decision, and the consultation finder lists no property licensing consultation. The forward plan page returned HTTP 403 to automated access. This is a bounded finding, not a verified absence of a scheme.
- Source access on 24 November 2026: plain curl requests to www.camden.gov.uk and democracy.camden.gov.uk returned Cloudflare HTTP 403 challenges. An HTTP client presenting a standard browser TLS profile (curl_cffi, not a logged-in or shared browser) received direct HTTP 200 responses for the HMO page, public notice, sealed designation, fee schedule, conditions, civil-penalty policy, 2024 review, consultation outcome page and land-use Article 4 page, and for decisions 4785 and 5385 and the 2026 decisions list; the forward plan stayed blocked. The 2020 designation, reduced-term, selective-scheme and later-planning gaps remain.
- Reduced licence terms conflict across current council sources: the 2026/27 fees PDF describes two-year licences without fee reduction, and the 2 Jul 2025 renewal release describes 'two-year licences for landlords where there are concerns about management or property condition', while the main HMO page, directly re-read on 24 November 2026, still states that some licences last one year and links a one-year-licence factsheet. Confirm the term and reasons on the individual licence.
- The separate section 257 component concerns the building-level licence. Confirm any separately licensable section 254 HMO flat and its application/fee with Camden; the block fee must not be multiplied automatically by the number of self-contained flats.
- Independent verification on 3 November 2026 confirmed the bounded Article 4 finding against all 21 GOV.UK register entries (including their entry dates) and the council’s current land-use page at https://prod-web-assets.camden.gov.uk/article-4-directions-land-use-classes . “None found” is not an authoritative statement that no later HMO direction exists.

## Landlord register

The national landlord register is separate from licensing. Camden is in London, where registration is planned from 15 July 2027 to 14 October 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/camden (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
