# Licensing in Hackney

## Do I need a selective licence in Hackney?

Only if the home is in one of the scheme's 17 wards. Selective licensing in Hackney runs in 17 wards from 1 May 2026; the council notice says it ceases to have effect on 30 April 2031. Check the postcode below, then confirm the address with the council before you apply.

Checked 24 Nov 2026. Council source: https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-landlords/check-which-property-licence-you-need

> Hackney has selective licensing in 17 wards and additional HMO licensing across the whole council area.

Scheme statuses as of 28 November 2026.

- Checked 24 Nov 2026 (researched_at 2026-11-24, verified_at 2026-11-24)
- Region: London
- ONS code: E09000012
- Web page: https://lettance.com/councils/hackney
- API: https://lettance.com/api/v1/councils/hackney

## Licensing schemes

### Selective licence: London Borough of Hackney Designation of an Area for Selective Licensing 2025

- Status: In force (`in_force`)
- Area: The entire district of each of 17 of Hackney's 21 wards, shown in purple on the map annexed to the designation. The council says this covers 76% of privately rented homes. The annex map shows Haggerston, Hoxton East & Shoreditch, Hoxton West and Woodberry Down unshaded and outside the selective designation. Additional and mandatory HMO licensing still apply in those wards where their property and household criteria are met. 17 wards named in the scheme: Brownswood, Cazenove, Clissold, Dalston, De Beauvoir, Hackney Central, Hackney Downs, Hackney Wick, Homerton, King’s Park, Lea Bridge, London Fields, Shacklewell, Springfield, Stamford Hill West, Stoke Newington, Victoria. Ward boundaries: current wards (designation does not state a boundary date).
- Runs: 1 May 2026 to 29 April 2031. The council notice says it ceases to have effect on 30 April 2031
- Fee: Published standard fee: £925. Part A £555 on application (non-refundable if rejected or withdrawn), Part B £370 on approval; final licence not issued until paid in full. Discounts: EPC B or above £100 off Part B; EPC C £50 off Part B; accredited landlord £100 off Part B; multi-dwelling £100 off Part A. The council’s publicly available Schedule of Fees, Charges and Discounts (footer: February 2026) provides the eligibility conditions below. No page-updated date shown. The multi-dwelling discount applies to the second and subsequent properties only: they must be contiguous in the same block or building, under common ownership and management control, with all applications made at the same time. The first flat pays Part A in full. Accredited-landlord eligibility includes LLAS, NRLA or UKALA accreditation, or ARLA or Safeagent membership. Discounts are assessed on a full application and supporting documents and do not apply if the council has made two requests for additional supporting documents or served a warning letter for failure to license. The schedule’s examples allow applicable EPC, accredited-landlord and multi-dwelling discounts together.
- Licence length: 5 years
- Who needs one: Privately rented homes in the 17 wards let to a single household (e.g. a family or couple), a single tenant, or 2 individuals sharing, unless licensable as a mandatory or additional HMO.
- Exemptions: Mandatory HMOs; HMOs licensable under the 2025 additional designation; temporary exemption notices (s86); interim or final management orders; tenancies exempt under s79(3) or article 2 of SI 2006/370.
- Apply: https://propertylicensing.hackney.gov.uk/
- Licence conditions: https://docs.google.com/document/d/1cUiXJCp6BsKd4r93ENK8976fhEMGoj32_rOwTHvRDME/edit?usp=sharing
- Council's map or designation: https://drive.google.com/file/d/1ffv6tcJGtCGXVEBuoJ86FBcnGwlUGJxR/view
- Confidence: High
- How we checked this: Designated 27 November 2025 (notice dated 1 December 2025) under the December 2024 general approval, so no Secretary of State confirmation. The designation starts on 1 May 2026; its notice names 30 April 2031 as the cessation day. Follows a 14-week consultation (12 June to 21 September 2025). Hackney previously ran selective (pilot) and additional schemes from 2018 to 2023, with a gap until May 2026. The designation notice and the council licence page still cite a £30,000 penalty and Section 21, but the council's April 2026 civil penalty policy uses the £40,000 Renters' Rights Act maximum. The council's Schedule of Fees, Charges and Discounts says 'Licences will be granted for the duration of the scheme (up to 5 years)'; shorter terms are possible where there are management concerns. The notice says the designation shall cease to have effect on 30 April 2031, before the fifth anniversary of its 1 May 2026 commencement. The last certainly covered day is 29 April. The date-only wording does not say whether 30 April is still covered; check with the council before letting without a licence on that day.
- Sources: https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-landlords/check-which-property-licence-you-need, https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-landlords/apply-property-licence, https://drive.google.com/file/d/1ffv6tcJGtCGXVEBuoJ86FBcnGwlUGJxR/view, https://news.hackney.gov.uk/news/landlords-in-hackney-to-meet-tighter-rules-as-hackney-approves-plans-to-introduce-property-licensing, https://docs.google.com/document/d/19oHG1tANN8kqc26I9cjJie5GVwsNEC6K_TEnhVUbp9w/edit?usp=sharing

### Additional HMO licence: London Borough of Hackney Designation of an Area for Additional Licensing 2025

- Status: In force (`in_force`)
- Area: Whole of the London Borough of Hackney.
- Runs: 1 May 2026 to 29 April 2031. The council notice says it ceases to have effect on 30 April 2031
- Fee: Published standard fee: £1,400. Part A £840 + Part B £560. Same discounts as selective (EPC B+ £100 / EPC C £50 / accredited £100 off Part B; multi-dwelling £100 off Part A). The multi-dwelling discount applies to the second and subsequent properties only: they must be contiguous in the same block or building, under common ownership and management control, with all applications made at the same time. The first flat pays Part A in full. Accredited-landlord eligibility includes LLAS, NRLA or UKALA accreditation, or ARLA or Safeagent membership. Discounts are assessed on a full application and supporting documents and do not apply if the council has made two requests for additional supporting documents or served a warning letter for failure to license. The schedule’s examples allow applicable EPC, accredited-landlord and multi-dwelling discounts together.
- Licence length: 5 years
- Who needs one: HMOs under s254(1)(a)-(d) occupied by 3 or more persons in 2 or more households that are not mandatory HMOs: in practice 3 or 4 sharers in houses, converted flats and flats in blocks. Section 257 converted blocks are excluded.
- Exemptions: Temporary exemption notices (s62); interim or final management orders; mandatory HMOs; Schedule 14 buildings; s257 HMOs.
- Apply: https://propertylicensing.hackney.gov.uk/
- Licence conditions: https://docs.google.com/document/d/17sNQ8GN0GyOfKxQ5Hb0pwACeepFL5wFPbLEGfQX7Y4k/edit?usp=sharing
- Council's map or designation: https://drive.google.com/file/d/1qtHjlAn9hxk0jzkNVrw5Mx2M2e3hWDk9/view
- Confidence: High
- How we checked this: Designated 27 November 2025 under the 2024 general approval. The selective notice refers to this as 'made on 1 December 2025', while the additional notice says designated 27 November 2025; the 1 December date appears to be the notice date. Licences are granted for the duration of the scheme, up to 5 years (Schedule of Fees, Charges and Discounts). The notice says the designation shall cease to have effect on 30 April 2031, before the fifth anniversary of its 1 May 2026 commencement. The last certainly covered day is 29 April. The date-only wording does not say whether 30 April is still covered; check with the council before letting without a licence on that day.
- Sources: https://drive.google.com/file/d/1qtHjlAn9hxk0jzkNVrw5Mx2M2e3hWDk9/view, https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-landlords/check-which-property-licence-you-need, https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-landlords/apply-property-licence, https://docs.google.com/document/d/19oHG1tANN8kqc26I9cjJie5GVwsNEC6K_TEnhVUbp9w/edit?usp=sharing

### Mandatory HMO licence: Mandatory HMO licensing (national scheme, Hackney fees)

- Status: In force (`in_force`)
- Area: Entire borough (national scheme).
- Fee: Published standard fee: £1,400. Part A £840 + Part B £560 (flat fee, same as additional HMO); same discounts. The multi-dwelling discount applies to the second and subsequent properties only: they must be contiguous in the same block or building, under common ownership and management control, with all applications made at the same time. The first flat pays Part A in full. Accredited-landlord eligibility includes LLAS, NRLA or UKALA accreditation, or ARLA or Safeagent membership. Discounts are assessed on a full application and supporting documents and do not apply if the council has made two requests for additional supporting documents or served a warning letter for failure to license. The schedule’s examples allow applicable EPC, accredited-landlord and multi-dwelling discounts together.
- Licence length: 5 years
- Who needs one: Shared homes with 5 or more people from 2 or more households sharing facilities.
- Exemptions: Schedule 14 Housing Act 2004.
- Apply: https://propertylicensing.hackney.gov.uk/
- Licence conditions: https://docs.google.com/document/d/17sNQ8GN0GyOfKxQ5Hb0pwACeepFL5wFPbLEGfQX7Y4k/edit?usp=sharing
- Confidence: High
- How we checked this: The council's Schedule of Fees, Charges and Discounts applies to all Hackney licence types and says licences are granted for up to 5 years.
- Sources: https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-landlords/apply-property-licence, https://docs.google.com/document/d/19oHG1tANN8kqc26I9cjJie5GVwsNEC6K_TEnhVUbp9w/edit?usp=sharing

## Article 4 for house shares

We found no Article 4 direction on house shares in Hackney.

None found. Hackney's Article 4 directions page (re-read 2026-11-24) lists Class E to residential, conservation area, launderette, storage/distribution and pub directions, plus a proposed non-immediate Ridley Road direction (commercial, business or service use to residential; consultation closed 5 March 2026, decision expected early 2027), but no C3-to-C4 (small HMO) direction.

Council source: https://www.hackney.gov.uk/planning-and-building/planning-policies-and-local-plan/article-4-directions

## HMO register

The council's public register of licensed HMOs: https://www.hackney.gov.uk/housing/private-tenants-and-landlords/private-tenants/help-private-sector-tenants (checked 24 November 2026). It lists licensed HMOs only.

The HMO register is a downloadable PDF linked from this page. The council says an unlisted property may have an application in progress.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has been updated for the Renters' Rights Act.

Civil Penalty Notice Policy (Appendix 2 to the Cabinet report 'Updates to enforcement and civil penalty notice policies', key decision CHE S703). The council's own report (https://hackney.moderngov.co.uk/documents/s98074/x.pdf, re-fetched 2026-11-24) is 'For Consideration By Cabinet' at the 27 April 2026 meeting, recommends that Cabinet 'Approve the Civil Penalty Notice Policy' and gives 'Implementation Date if Not Called In: 4 May 2026'. The council's own modern.gov web service record of the 27 April 2026 Cabinet meeting (https://hackney.moderngov.co.uk/mgWebService.asmx/GetMeeting?lMeetingId=6145, item 10, decision published) records 'RESOLVED: ... 2. To approve the Civil Penalty Notice Policy attached as Appendix B'. The council's HTML decision and minutes pages still return a Cloudflare 403 challenge. The matrix runs: statutory-guidance starting point; Landlord Type adjustment (+20% for 6+ properties, 3+ HMOs, corporate landlord/director or significant experience; -20% only for small inexperienced landlords); mitigation up to -20%; aggravation; financial considerations; totality. Failure to obtain a selective licence starts at £12,000 (£9,600 / £12,000 / £14,400). Failure to obtain an HMO licence starts at £17,000 (£13,600 / £17,000 / £20,400). The statutory maximum is £40,000. The prompt-payment section says 'the Council will apply a discount of 20 %' if paid within the final-notice period (normally 28 days), but its worked example applies 'a 15% prompt payment discount' to a £16,000 penalty (£13,600), an internal inconsistency.

Policy: https://hackney.moderngov.co.uk/documents/s98076/Appendix%202%20-%20CPN%20Policy%201.pdf

## Consultations

- [Proposals to introduce additional HMO and selective property licensing](https://drive.google.com/drive/folders/1L6REa8BOtXA3v7qVZciZMJhlLlUPUw5n?usp=sharing): Approved. Closed 21 September 2025.

## Not yet confirmed

We could not settle these points when we researched Hackney on 24 November 2026. Check them with the council before you rely on them.

- Prompt-payment discount in the civil penalty policy: the text says 20%, the worked example says 15% (re-read 24 November 2026).
- No C3-to-C4 Article 4 direction appears on the council's Article 4 page (re-read 24 November 2026); confirm with Hackney planning that none exists elsewhere (e.g. a proposed direction).
- Checked 24 November 2026: the Cabinet agendas for 22 September, 6 October, 26 October and 23 November 2026 and the Housing & Homelessness Scrutiny Commission agenda for 19 October 2026 (read through the council's modern.gov web service, because its HTML committee pages return a Cloudflare 403 challenge) contain no licensing scheme or civil penalty item. The 6 October 2026 Cabinet (item 6) heard a deputation asking the council to introduce a C3-to-C4 small-HMO Article 4 direction, borough-wide or first in Lea Bridge and King's Park wards (https://hackney.moderngov.co.uk/mgConvert2PDF.aspx?ID=99930); the 6 October minutes (https://hackney.moderngov.co.uk/mgConvert2PDF.aspx?ID=100924, item 6) record the Cabinet member's reply that a direction needs a robust evidence base, an immediate direction would be premature, and officers will gather evidence on HMO conversions and review HMO planning policy through the Local Plan review. No such direction has been made or proposed on its Article 4 page. No new scheme, consultation or fee change was found on the council's licensing pages.

## Landlord register

The national landlord register is separate from licensing. Hackney is in London, where registration is planned from 15 July 2027 to 14 October 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/hackney (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
