# Licensing in North Warwickshire

> Our research lists no selective or additional licensing scheme in force in North Warwickshire.

Scheme statuses as of 28 November 2026.

- Checked 25 Nov 2026 (researched_at 2026-11-25, verified_at 2026-11-25)
- Region: West Midlands
- ONS code: E07000218
- Web page: https://lettance.com/councils/north-warwickshire
- API: https://lettance.com/api/v1/councils/north-warwickshire

## Licensing schemes

### Mandatory HMO licence: Mandatory HMO licensing (national scheme, North Warwickshire fees)

- Status: In force (`in_force`)
- Area: The whole of North Warwickshire borough (national scheme).
- Fee: Published standard fee: £904. The council's HMO licensing page: new application £904 (5 to 9 occupiers), £952 (10 to 14), £1,000 (15 to 19), £1,046 (20+); renewal £833 (5 to 9), £870 (10 to 14), £907 (15 to 19), £944 (20+). The council's 'Fees and charges from 1 April 2026' schedule agrees except for the 5 to 9 new-application fee, which it shows as £804, and it also lists a '2-4' band (£856 new, £797 renewal) and a £187 licence variation fee. Licences are not transferable.
- Licence length: 5 years
- Who needs one: A house in multiple occupation where five or more unrelated people live and all or some of them share a toilet, bathroom or kitchen.
- Apply: https://www.gov.uk/find-licences/house-in-multiple-occupation-licence/north-warwickshire/apply
- Confidence: High
- How we checked this: This is the national scheme. North Warwickshire publishes its own page and fees. Licences are usually granted for five years, but may be shorter if the property lacks planning permission or has known management failings. Applications are usually processed within 6 to 8 weeks and the council aims to visit every HMO before issuing a licence. New licence conditions apply to HMO licence applications received from May 2026. The page notes that since 2 March 2026 all new HMOs, regardless of size, need planning permission (see Article 4). The council's Article 4 consultation page (https://www.northwarks.gov.uk/article4) says 'Article 4 Directions do not apply retrospectively so existing occupied HMOs would not require permission'. The council's HMO Policy (Resources Board report of 21 July 2026, Appendix A; approved at that meeting, minute 9 in the minutes printed in the 19 October 2026 Resources Board pack) states 'There are no additional or selective licensing schemes in operation within North Warwickshire' and that mandatory licensing 'is the only licensing regime operating in North Warwickshire'. Under that policy a first-time application for a property without the correct planning permission gets a 1-year licence to let planning status be regularised; if it is not regularised by expiry, applications are not processed until permission, a certificate of lawful HMO use or sufficient evidence of historic HMO use is obtained. The policy says the fee is paid in two instalments (on application, and before the final licence is issued) and that a late renewal may be issued expiring in line with the previous licence.
- Sources: https://www.northwarks.gov.uk/private-rented-housing/houses-multiple-occupation/2, https://www.northwarks.gov.uk/downloads/file/2932/fees-and-charges-2026-2027, https://www.gov.uk/find-licences/house-in-multiple-occupation-licence/north-warwickshire/change, https://www.northwarks.gov.uk/download/meetings/id/2456/Download%2520the%2520Agenda%252C%2520Reports%2520and%2520Appendices, https://www.northwarks.gov.uk/download/meetings/id/2523/Download%2520the%2520Agenda%252C%2520Reports%2520and%2520Appendices, https://www.northwarks.gov.uk/article4

## Article 4 for house shares

North Warwickshire has an Article 4 direction on HMOs (shared houses). Turning a family home into a shared house may need planning permission.

- Area: The whole council area
- Takes effect: 2 March 2026

Council source: https://www.northwarks.gov.uk/downloads/file/2901/hmo-article-4

## HMO register

The council's public register of licensed HMOs: https://www.northwarks.gov.uk/private-rented-housing/houses-multiple-occupation/4 (checked 25 November 2026). It lists licensed HMOs only.

The page links to an 'HMO Public Register' download page (https://www.northwarks.gov.uk/downloads/download/166/hmo-public-register) offering an undated 13 kB XLSX file; the council gives no warranty on accuracy.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has been updated for the Renters' Rights Act.

'Civil penalties under the Renters' Rights Act 2025 and other housing legislation' (the PDF was created on 22 June 2026). The Resources Board approved the 'updated Environmental Health and Private Sector Housing Enforcement Policy and Civil Penalty Policy (effective from 1 May 2026)' on 16 March 2026 (minute 42, 'Implementation of Renters Right Act 2025', printed in the 21 July 2026 Resources Board pack: https://www.northwarks.gov.uk/download/meetings/id/2456/Download%2520the%2520Agenda%252C%2520Reports%2520and%2520Appendices); the March report's Appendix 3 has the same £17,000 / £40,000 / £13,600 / £20,400 HMO licence matrix (https://www.northwarks.gov.uk/download/meetings/id/2240/Agenda%2520-%2520Resources%2520Board%2520-%252016%2520March%25202026). Statutory maximum £40,000 for licensing offences. Failure to obtain an HMO licence (s.72(1)) starts at £17,000, adjusted 20% for 'Landlord Type' (£13,600 downward, £20,400 upward). The offence list covers HMO licensing but not selective licensing. A 15% prompt payment discount applies. Older documents remain on the council site: a 'Civil Penalties Enforcement Policy & Guidance' (file 1480), a 'Financial Penalty Enforcement Policy & Guidance' (file 1478) and an Environmental Health and Private Sector Housing Enforcement Policy dated September 2024.

Policy: https://www.northwarks.gov.uk/downloads/file/3223/civil-penalty-policy

## Consultations

We found no consultations when we researched North Warwickshire.

## Not yet confirmed

We could not settle these points when we researched North Warwickshire on 25 November 2026. Check them with the council before you rely on them.

- The new-application fee for 5 to 9 occupiers differs between the HMO page (£904) and the 2026-27 fees schedule (£804). The page figure is recorded. Both re-fetched 25 November 2026 and still differ. Confirm with the council.
- The fees schedule lists a '2-4' occupancy band and a £187 variation fee, which the HMO page does not mention, while the council's GOV.UK licence page says 'We do not charge existing licence holders to vary a licence' (both re-fetched 25 November 2026). Confirm what applies.
- No selective or additional licensing scheme, consultation or proposal was found. The council's HMO Policy approved by the Resources Board on 21 July 2026 states there are none in operation. Re-checked 25 November 2026: the HMO pages and Private Rented Housing hub list mandatory HMO licensing only; the council site search (https://www.northwarks.gov.uk/site-search/results/?q=selective+licensing) found no scheme or proposal; and the Resources Board (30 November 2026), Executive Board (23 November 2026) and Full Council (2 December 2026) agenda packs contain no licensing designation or consultation item.
- Independent check of 25 November 2026 confirmed the Resources Board sources for the absence of a selective or additional scheme (HMO Policy, 21 July 2026, minute 9) and the 16 March 2026 approval of the civil penalty policy (minute 42), but could not settle which of the £904 and £804 fees the council charges; both published figures still differ.

## Landlord register

The national landlord register is separate from licensing. North Warwickshire is in West Midlands, where registration is planned from 15 December 2026 to 14 March 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/north-warwickshire (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
