# Licensing in Redbridge

## Do I need a selective licence in Redbridge?

Only if the home is in one of the scheme's 17 wards. Selective licensing in Redbridge runs in 17 wards. Check the postcode below, then confirm the address with the council before you apply.

Checked 24 Nov 2026. Council source: https://www.redbridge.gov.uk/housing/landlords/selective-licensing/

> Redbridge has selective licensing in 17 wards and additional HMO licensing across the whole council area.

Scheme statuses as of 28 November 2026.

- Checked 24 Nov 2026 (researched_at 2026-11-24, verified_at 2026-11-24)
- Region: London
- ONS code: E09000026
- Web page: https://lettance.com/councils/redbridge
- API: https://lettance.com/api/v1/councils/redbridge

## Licensing schemes

### Selective licence: The London Borough of Redbridge Selective Licensing Scheme (Ilford Town and Valentines Wards) 2023 (Scheme 3)

- Status: In force (`in_force`)
- Area: Two central Ilford wards, edged red on the map at Annex A of the designation. 2 wards named in the scheme: Ilford Town, Valentines. Ward boundaries: unknown.
- Runs: 1 November 2023 to 30 October 2028. The council notice says it ceases to have effect on 31 October 2028
- Fee: Published standard fee: £997.69. For applications submitted 1 April 2026 to 31 March 2027: £371.05 on application plus £626.64 on approval (£591.64 with proof of accreditation, a £35 discount). Paper application: an extra £139.23. Optional pre-licensing property visit and report: £477.
- Who needs one: Any house or flat in the two wards let or occupied under a tenancy or licence (a single person, two people or a single household) that is not a licensable HMO.
- Exemptions: Licensable HMOs; non-profit registered-provider lettings; and the exempt tenancies in Appendix B of the notice (SI 2006/370 categories: prohibition orders, business, licensed-premises and agricultural tenancies, public-body lettings, specified student lettings, long leases, family arrangements, holiday lets, resident-landlord sharing). The council page also lists properties where the landlord already holds an HMO licence, and empty properties.
- Apply: https://redbridge.metastreet.co.uk/
- Licence conditions: https://www.redbridge.gov.uk/housing/landlords/selective-licensing/selective-licence-conditions/
- Council's map or designation: https://my.redbridge.gov.uk/map/property-licensing-sls3
- Confidence: High
- How we checked this: Signed 26 June 2023. No Secretary of State confirmation was needed (2015 General Approval). Notice paragraph 4: 'This designation will come into force on 1st November 2023 and unless revoked beforehand or extended will cease to have effect on 31st October 2028.' The cessation date is the day before the fifth anniversary, so end_date is 30 October 2028 and ceases_on is recorded. Licences are only approved for properties with EPC grades A-E. The licence holder must complete a landlord accreditation course (LLAS or similar) within 18 months of the full licence. The selective and HMO licensing pages (read 24 November 2026) say tenants can reclaim up to 24 months' rent. Redbridge moved to a new property licensing system (Metastreet, redbridge.metastreet.co.uk) on 3 November 2026; applications started before 3 November 2026 are completed through the previous portal (propertylicensing.redbridge.gov.uk).
- Sources: https://www.redbridge.gov.uk/housing/landlords/selective-licensing/, https://www.redbridge.gov.uk/media/ec0a1m2j/notice-of-designation-for-selective-licensing-scheme-3.pdf

### Selective licence: The London Borough of Redbridge Selective Licensing (Scheme 4) 2024

- Status: In force (`in_force`)
- Area: Fifteen wards, edged red on the map at Annex A of the designation. Together with Scheme 3, 17 wards are covered. 15 wards named in the scheme: Aldborough, Barkingside, Chadwell, Churchfields, Clementswood, Cranbrook, Fairlop, Goodmayes, Hainault, Loxford, Mayfield, Newbury, Seven Kings, South Woodford, Wanstead Village. Ward boundaries: unknown.
- Runs: 8 April 2024 to 6 April 2029. The council notice says it ceases to have effect on 7 April 2029
- Fee: Published standard fee: £997.69. Same 2026/27 fee as Scheme 3: £371.05 plus £626.64 (£35 off the second payment if accredited). Paper application: an extra £139.23.
- Who needs one: Any house or flat in the 15 wards let or occupied under a tenancy or licence (a single person, two people or a single household) that is not a licensable HMO.
- Exemptions: As Scheme 3: licensable HMOs, registered-provider lettings and SI 2006/370 exempt tenancies (Appendix B of the notice).
- Apply: https://redbridge.metastreet.co.uk/
- Licence conditions: https://www.redbridge.gov.uk/housing/landlords/selective-licensing/selective-licence-conditions/
- Council's map or designation: https://my.redbridge.gov.uk/map/property-licensing-sls4
- Confidence: High
- How we checked this: Application to the Secretary of State was made 4 August 2023 and confirmed 20 December 2023 (notice signed 21 December 2023). Notice paragraph 4: 'This designation will come into force on 8 April 2024 and unless revoked beforehand or extended will cease to have effect on 7 April 2029.' The cessation date is the day before the fifth anniversary, so end_date is 6 April 2029 and ceases_on is recorded. EPC A-E and accreditation-course requirements as Scheme 3. Redbridge moved to a new property licensing system (Metastreet, redbridge.metastreet.co.uk) on 3 November 2026; applications started before 3 November 2026 are completed through the previous portal (propertylicensing.redbridge.gov.uk).
- Sources: https://www.redbridge.gov.uk/housing/landlords/selective-licensing/, https://www.redbridge.gov.uk/media/rihjjbnf/notice-of-designation-for-selective-licensing-scheme-4.pdf, https://www.redbridge.gov.uk/news/dec-2023/government-approves-new-15-ward-selective-licensing-scheme-in-redbridge-from-8-april-2024

### Additional HMO licence: The London Borough of Redbridge Additional HMO Licensing Scheme 2023

- Status: In force (`in_force`)
- Area: The whole London Borough of Redbridge, edged red on the map at Annex A.
- Runs: 18 September 2023 to 16 September 2028. The council notice says it ceases to have effect on 17 September 2028
- Fee: Published standard fee: £1,865.34. For applications 1 April 2026 to 31 March 2027, by number of households. First stage is £696.14 at every size. Totals: 2 households £1,865.34; 3 £1,969.60; 4 £2,088.42; 5 £2,185.95; 6 £2,296.93; 7 £2,401.18; 8 £2,506.56; 9 £2,617.53; 10+ £2,728.51. £35 off the second stage with accreditation. Paper application: an extra £139.23. One fee table covers both HMO licence types.
- Licence length: 5 years
- Who needs one: HMOs under any section 254 test rented to 3 or more occupiers in 2 or more households who share (or lack) a toilet, washing or cooking facilities, other than mandatory HMOs. Also section 257 converted buildings where all units are privately rented and the building and units are in the same ownership or control, including above non-residential premises.
- Exemptions: Schedule 14 buildings; HMOs under interim or final management orders; HMOs with a temporary exemption; mandatory-licensable HMOs; section 257 buildings of no more than two flats.
- Apply: https://redbridge.metastreet.co.uk/
- Licence conditions: https://www.redbridge.gov.uk/housing/landlords/houses-in-multiple-occupation-licensing/additional-hmo-licence-conditions/
- Council's map or designation: https://www.redbridge.gov.uk/media/rxtl3gqa/notice-of-designation-for-additional-hmo-licensing-scheme.pdf
- Confidence: High
- How we checked this: Notice dated 30 May 2023 under the 2015 General Approval. Notice paragraph 4: 'This designation will come into force on Monday 18 September 2023 and unless revoked beforehand or extended will cease to have effect on 17 September 2028 or earlier if the Council revokes the scheme under section 60 of the Act.' The cessation date is the day before the fifth anniversary, so end_date is 16 September 2028 and ceases_on is recorded. Proof of planning permission to run an HMO is requested. HMOs of up to 6 people begun after 6 December 2019 need planning consent (borough-wide Article 4). For 7+ person HMOs without the correct planning status, the council normally issues a 1-year licence. Redbridge moved to a new property licensing system (Metastreet, redbridge.metastreet.co.uk) on 3 November 2026; applications started before 3 November 2026 are completed through the previous portal (propertylicensing.redbridge.gov.uk).
- Sources: https://www.redbridge.gov.uk/housing/landlords/houses-in-multiple-occupation-licensing/, https://www.redbridge.gov.uk/media/rxtl3gqa/notice-of-designation-for-additional-hmo-licensing-scheme.pdf

### Mandatory HMO licence: Mandatory HMO licence

- Status: In force (`in_force`)
- Area: National scheme across the whole borough.
- Fee: Published standard fee: £1,865.34. Same 2026/27 HMO fee table as additional licensing (by households; first stage £696.14). A 5-household HMO costs £2,185.95.
- Licence length: 5 years
- Who needs one: Privately rented properties occupied by 5 or more people making up 2 or more households.
- Exemptions: Schedule 14, Housing Act 2004.
- Apply: https://redbridge.metastreet.co.uk/
- Licence conditions: https://www.redbridge.gov.uk/housing/landlords/houses-in-multiple-occupation-licensing/mandatory-hmo-licence-conditions/
- Confidence: High
- How we checked this: Redbridge moved to a new property licensing system (Metastreet, redbridge.metastreet.co.uk) on 3 November 2026; applications started before 3 November 2026 are completed through the previous portal (propertylicensing.redbridge.gov.uk).
- Sources: https://www.redbridge.gov.uk/housing/landlords/houses-in-multiple-occupation-licensing/

## Article 4 for house shares

Redbridge has an Article 4 direction on HMOs (shared houses). Turning a family home into a shared house may need planning permission.

- Area: Borough_wide (whole of the London Borough of Redbridge; non-immediate direction made 3 December 2018, confirmed 23 April 2019)
- Takes effect: 6 December 2019

Council source: https://www.redbridge.gov.uk/planning-and-building/planning/article-4-direction-on-c4-hmos/

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has not been updated for the Renters' Rights Act.

Private Sector Housing Enforcement Policy 2023: implemented 21 July 2023, supersedes February 2019, next review October 2025 (overdue). It states a £30,000 maximum and follows the 2016 DLUHC guidance. Appendix A matrix scores six criteria: severity (1-20), culpability, harm or potential harm, punishment, deterrence, and financial benefit. The total score maps to a fee band: 1-5 £250; 6-10 £500; 11-20 £750; 21-30 £1,000; 31-40 £2,500; 41-50 £5,000; 51-60 £10,000; 61-70 £15,000; 71-80 £20,000; 81-90 £25,000; 91-120 £30,000. The matrix is guidance only. An enforcement panel (a senior officer and a manager) decides between prosecution and civil penalty and reviews representations. There is a 28-day representation period and a right of appeal to the First-tier Tribunal. Much of the PDF text is not machine-readable; the cover, sections 12-13 and Appendices A-B were read.

Policy: https://www.redbridge.gov.uk/media/iphb5pj5/psh-enforcement-policy-2023-final.pdf

## Consultations

We found no consultations when we researched Redbridge.

## Not yet confirmed

We could not settle these points when we researched Redbridge on 24 November 2026. Check them with the council before you rely on them.

- Licence term for selective licences is not stated on the council page (HMO licences: five years).
- Ward boundary vintage for the Scheme 3 and Scheme 4 designations is not stated in the notices.
- Remaining wards outside the selective schemes are not named by the council pages fetched. Only the 17 covered wards are listed.
- Enforcement policy review date (October 2025) has passed and the matrix tops out at £30,000. The 2023 PDF was still the one served on 24 November 2026, and no replacement policy was found then. Check whether Redbridge adopts a Renters' Rights Act 2025 update.
- No renewal or replacement licensing consultation, Cabinet decision or new designation was found on 24 November 2026: the Cabinet forward plan for November 2026 to February 2027 (moderngov.redbridge.gov.uk) lists no property licensing item, the agendas for Cabinet on 12 November 2026, Overview and Scrutiny on 9 November 2026 and the Housing Committee on 18 November 2026 (read through the modern.gov web service) include none, the 15 December 2026 Cabinet agenda was not yet published, and the selective and HMO licensing pages mention none. Let's Talk Redbridge (engage.redbridge.gov.uk) renders its project list with JavaScript, so it could not be searched; the council site search returned 404.
- Not independently re-checked (verification of 2026-10-14): the matrix bands in the 2023 enforcement policy (the PDF text is largely not machine-readable).

## Landlord register

The national landlord register is separate from licensing. Redbridge is in London, where registration is planned from 15 July 2027 to 14 October 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/redbridge (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.