# Licensing in Sandwell

> Sandwell has additional HMO licensing across the whole council area.

Scheme statuses as of 28 November 2026.

- Checked 24 Nov 2026 (researched_at 2026-11-24, verified_at 2026-11-24)
- Region: West Midlands
- ONS code: E08000028
- Web page: https://lettance.com/councils/sandwell
- API: https://lettance.com/api/v1/councils/sandwell

## Licensing schemes

### Additional HMO licence: The Metropolitan Borough Council of Sandwell Designation for an Area for Additional Licensing of Houses in Multiple Occupation 2024

- Status: In force (`in_force`)
- Area: All wards within the Metropolitan Borough of Sandwell, as delineated and edged red on the map at Appendix A of the designation.
- Runs: 1 October 2024 to 29 September 2029. The council notice says it ceases to have effect on 30 September 2029
- Fee: Published standard fee: £1,021. Additional licence fees are the same as mandatory HMO fees. The council's HMO fees page, headed 'HMO Licence fees from 1 April 2025 - 31 March 2026', shows a first application fee of £1,021, paid in two parts: £655 when the application is approved and £366 when the draft licence is issued. The renewal fee is £727.25 (£507.25 + £220). Discounts: £168.30 for MLAS membership or housing-management training/qualifications (initial application), £56.10 for NRLA or similar membership, and £56.10 for second and subsequent properties. The page says fees go up every 1 April; no 2026/27 figure was found. The first payment is not refunded if an application is rejected after it is paid.
- Who needs one: Every privately rented HMO under section 254 of the Housing Act 2004 occupied by 3 or more people forming 2 or more households, whatever the number of storeys, plus section 257 HMOs (converted blocks of flats), unless the HMO already needs a mandatory licence. The council summarises it as any property with 3 or 4 people sharing amenities.
- Exemptions: Buildings that are not HMOs under Schedule 14 (Appendix C: those managed by local housing authorities, registered providers, police, fire or NHS bodies, certain co-operatives, specified student accommodation, religious communities, owner-occupied buildings with limited lodgers, and buildings occupied by only two persons in two households); HMOs under an interim or final management order; HMOs with a temporary exemption notice (s.62); HMOs requiring a mandatory licence (s.55(2)(a)).
- Apply: https://www.sandwell.gov.uk/find-home/additional-licensing/2
- Licence conditions: https://www.sandwell.gov.uk/downloads/download/590/hmo-conditions
- Council's map or designation: https://www.sandwell.gov.uk/downloads/file/2838/additional-licensing-scheme-designation-2024
- Confidence: High
- How we checked this: Cabinet approved the borough-wide scheme on 19 June 2024 after a 10-week consultation from 8 January to 18 March 2024. The designation was made on 19 June 2024 under the 2015 General Approval, so it did not need confirmation by the Secretary of State. It replaced the 2022 additional licensing scheme that covered part of West Bromwich, which was revoked with effect from 1 October 2024. The council says properties licensed under the West Bromwich scheme are licensed under the new scheme. The council's additional licensing page says the licence 'will be for the duration of the scheme', so it runs no later than the scheme's last day in force, 29 September 2029, and the council can shorten it if there are concerns. The designation says it 'will cease to have effect on the 30th September 2029 or earlier if the Council revokes the scheme under Section 60 of the Act', so end_date is 29 September 2029. That date is the day before the fifth anniversary of the 1 October 2024 start, so ceases_on records 30 September 2029: the designation does not say whether that day is still covered, and the public notice says the designation 'will last for 5 years, until 30th September 2029', so the checker asks landlords to confirm with the council on that day (designation and public notice rechecked 24 November 2026). Applications are made online through MySandwell. The designation and public notice still warn of a civil penalty of up to £30,000 for failing to licence; the council's July 2026 enforcement policy applies the Renters' Rights Act 2025 maximum of £40,000 to offences from 1 May 2026. The council also has a dedicated section 257 HMO policy page and will treat a converted building as a licensable s.257 HMO if the owner cannot produce a 1991 Building Regulations completion certificate.
- Sources: https://www.sandwell.gov.uk/downloads/file/2838/additional-licensing-scheme-designation-2024, https://www.sandwell.gov.uk/downloads/file/2839/additional-licensing-scheme-designation-public-notice-2024, https://www.sandwell.gov.uk/find-home/additional-licensing, https://www.sandwell.gov.uk/find-home/additional-licensing/2, https://www.sandwell.gov.uk/find-home/additional-licensing/4, https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo/2, https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo/20

### Mandatory HMO licence: Mandatory HMO licensing (national scheme, Sandwell fees)

- Status: In force (`in_force`)
- Area: The whole borough (national scheme).
- Fee: Published standard fee: £1,021. Same fees as additional licensing: £1,021 for a first application (£655 + £366) and £727.25 for a renewal (£507.25 + £220), per the page headed 1 April 2025 - 31 March 2026. Discounts of £168.30 (MLAS or training), £56.10 (NRLA or similar) and £56.10 (second and subsequent properties).
- Licence length: 5 years
- Who needs one: HMOs occupied by 5 or more people forming 2 or more households and sharing amenities.
- Exemptions: Statutory exemptions under Schedule 14, Housing Act 2004.
- Apply: https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo/3
- Licence conditions: https://www.sandwell.gov.uk/downloads/download/590/hmo-conditions
- Confidence: High
- How we checked this: The council says a full licence is usually granted for 5 years, but can be 1 to 4 years if there are concerns. The application process has a 14-day fit and proper person consultation and a 14-day representation period after a draft licence is issued.
- Sources: https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo, https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo/2, https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo/5

## Article 4 for house shares

Sandwell has an Article 4 direction on HMOs (shared houses). Turning a family home into a shared house may need planning permission.

- Area: Borough-wide. Sandwell made an immediate Article 4(1) direction ('Sandwell Borough houses in multiple occupation' Article 4(1) Direction 1 of 2026) on 17 November 2026, removing the Class L(b) permitted development right to change a dwellinghouse (C3) to a small HMO (C4, 3 to 6 unrelated people) across the whole borough, edged red on the direction plan. Cabinet approved it on 14 October 2026. Conversions made before 17 November 2026 are not affected. As an immediate direction it is in force during the consultation (19 November to 21 December 2026) and must be confirmed within six months of coming into force or it lapses.
- Takes effect: 17 November 2026

Council source: https://www.sandwell.gov.uk/find-home/housing-multiple-occupation-hmo/22

## HMO register

The council's public register of licensed HMOs: https://www.sandwell.gov.uk/find-home/private-landlord-advice/10 (checked 24 November 2026). It lists licensed HMOs only.

The page links to a downloadable register of HMO licences. It gives no update date; questions go to landlord_licensing@sandwell.gov.uk.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has been updated for the Renters' Rights Act.

The Private Rented Sector and Housing Standards Enforcement Policy was approved by Cabinet on 15 July 2026 and covers the Renters' Rights Act 2025. The approved PDF says it is effective from 15 July 2026; the Word version says 17 July 2026. It caps any single penalty at £40,000 (or £30,000 where the limit is lower). For offences on or after 1 May 2026 it uses the MHCLG statutory guidance starting points: unlicensed HMO (mandatory or additional) £17,000, unlicensed selective licensing property £12,000, failure to comply with an improvement notice £25,000, and breach of HMO licence conditions £7,000 per breach. A second offence by the same person or company goes to £40,000. Adjustments include +£10,000 where an occupant is vulnerable or significant harm occurred, and -50% for financial hardship. A penalty applies to each responsible person, so joint owners can each receive the full penalty. Several of the council's HMO web pages still say the maximum is £30,000, but the licence conditions page notes £40,000 from 1 May 2026.

Policy: https://www.sandwell.gov.uk/downloads/file/6109/housing-enforcement-policy

## Consultations

- [Additional licensing of HMOs borough wide](https://www.sandwell.gov.uk/find-home/additional-licensing/4): Approved. Closed 18 March 2024.
- [Immediate Article 4 Direction for small HMOs (C3 to C4), borough wide](https://www.sandwell.gov.uk/downloads/file/6492/article-4-direction-notice): Open. Closes 21 December 2026.

## Not yet confirmed

We could not settle these points when we researched Sandwell on 24 November 2026. Check them with the council before you rely on them.

- The fee page is still headed 'HMO Licence fees from 1 April 2025 - 31 March 2026' (rechecked 24 November 2026) and says fees rise every 1 April; the additional licensing page still shows £1,021 under a '1 April 2024 - 31 March 2025' heading. Confirm the 2026/27 fee with the council.
- The licence term for additional licences is described as 'the duration of the scheme', but the HMO pages say licences usually last 5 years. Confirm whether additional licences granted now end when the designation ceases to have effect (last day in force 29 September 2029).
- Article 4 direction: the immediate borough-wide direction for C3 to C4 changes has been in force since 17 November 2026 (direction and notice read 24 November 2026). Confirm whether the council confirms it after the consultation closing 21 December 2026; Cabinet asked for a further report before the end of the six-month period, after which an unconfirmed immediate direction lapses.
- No selective licensing scheme was found on the council's site. A June 2019 Cabinet report (https://sandwell.moderngov.co.uk/documents/s3824/05a%20-%20APPENDIX%201%20-%204%20March%202019%20Cabinet%20Report%20on%20Selective%20and%20Additional%20Licensing.pdf) sought permission to consult on selective and additional licensing for an area of West Bromwich; the only West Bromwich scheme the council's site now mentions is the 2022 additional licensing designation, revoked from 1 October 2024. Confirm no selective scheme is planned.
- Not independently re-checked (verification of 2026-10-14): a 2026/27 fee (both fee pages still carry 2024/25 or 2025/26 headings, rechecked 24 November 2026). Rechecked 24 November 2026 through the sandwell.moderngov.co.uk public web service (mgWebService.asmx GetMeetings/GetMeeting): Cabinet meetings of 14 October and 11 November 2026, Council of 20 October 2026 and Planning Committee of 21 October 2026 list no item on a new, renewed or selective licensing scheme; Cabinet on 14 October 2026 approved the borough-wide Article 4 direction for small HMOs. The council's additional licensing and HMO pages show no new licensing proposal.

## Landlord register

The national landlord register is separate from licensing. Sandwell is in West Midlands, where registration is planned from 15 December 2026 to 14 March 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/sandwell (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
