# Licensing in Southend-on-Sea

## Do I need a selective licence in Southend-on-Sea?

Only if the home is inside the area the scheme covers. Selective licensing in Southend-on-Sea covers part of the council area from 1 December 2021; the council notice says it ceases to have effect on 30 November 2026. A further selective scheme in part of the council area is proposed. Check the postcode below, then confirm the address with the council before you apply.

Checked 25 Nov 2026. Council source: https://www.southend.gov.uk/private-housing/selective-licensing-scheme

> Southend-on-Sea has selective licensing in part of the council area. A selective scheme in part of the council area is proposed.

Scheme statuses as of 28 November 2026.

- Checked 25 Nov 2026 (researched_at 2026-11-25, verified_at 2026-11-25)
- Region: East of England
- ONS code: E06000033
- Web page: https://lettance.com/councils/southend-on-sea
- API: https://lettance.com/api/v1/councils/southend-on-sea

## Licensing schemes

### Selective licence: Southend Borough Council Designation of an Area for Selective Licensing 2021

- Status: In force (`in_force`)
- Area: Some neighbourhoods within the wards of Milton, Kursaal, Victoria and Chalkwell, as shown on the council's designation map. The council's consultation page describes it as eight neighbourhoods; its map caption lists Kursaal ward, parts of Milton, one part of Victoria and one part of Chalkwell. Check the address on the council's map rather than relying on the ward.
- Runs: 1 December 2021 to 29 November 2026. The council notice says it ceases to have effect on 30 November 2026
- Fee: Published standard fee: £830. From the council's Applications page: 'The full licence fee is £830 payable in two parts': Part A £208 with the application and Part B £622, which the council takes automatically before the licence is issued. The page shows no date for the fee.
- Licence length: 5 years
- Who needs one: Privately rented homes in the designated neighbourhoods let under a tenancy or licence that do not need a mandatory HMO licence. The council page describes these as homes occupied by one or two people or by one family household. Each flat in a building needs its own licence.
- Exemptions: The designation excludes HMOs that must be licensed under Part 2 of the Housing Act 2004, tenancies granted by a registered social landlord, houses under an interim or final management order, houses with a temporary exemption under section 86, and tenancies exempt under SI 2006/370. A property already licensed as a mandatory HMO does not also need a selective licence.
- Apply: https://propertylicensing.southend.gov.uk/
- Council's map or designation: https://southend.maps.arcgis.com/apps/instant/sidebar/index.html?appid=94617cdb667f47758dc3fd711098d83e
- Confidence: High
- How we checked this: Made on 18 March 2021 under the 2015 general approval (no Secretary of State confirmation needed). The public notice says the designation 'will come into force on 01st December 2021' and 'shall cease to have effect on 30th November 2026 (or earlier if the Council decides to revoke the designation under section 84 of the Act)', so end_date records 29 November 2026, the last day it is certainly in force, and ceases_on records 30 November 2026: the notice does not say whether that day is still covered, so the checker asks landlords to confirm with the council on it (rechecked against the notice on 2 November 2026). The scheme ends within weeks of this research. The council announced a replacement and expansion consultation on 23 October 2026. The Your Say page, updated 11 November 2026, says the survey is open until 5pm on 4 January 2027. The 23 October news article still says the consultation closes on 31 December 2026. Its announcement expressly says there will be a gap after the existing scheme ends. A possible 1 April 2027 implementation is subject to consultation, approvals and statutory requirements; no final decision has been made. The proposed boundary, fee and designation dates are not confirmed here. The earlier 'Southend Housing Selective Licensing' survey remains closed, with no published outcome. The council page says a licence is 'valid for five years from the date that it is issued' and may be shorter if there are concerns. No licence conditions document is linked from the council pages. Selective licensing enquiries: PropertyLicensing@southend.gov.uk, 01702 212220. The council's 'Ending of the Selective Licensing Scheme' page (read 5 November 2026) says the scheme 'is due to expire on 30 November 2026', that 'All property licences granted under this scheme will expire on 30 November 2026' and that 'no licence renewal application is required at this time'. It adds that, should a new scheme be approved, the council will contact affected landlords 'during 2027' with implementation dates and application requirements. Rechecked 23 November 2026: the public notice still says the designation 'shall cease to have effect on 30th November 2026', and the council's ending page still says the scheme 'is due to expire on 30 November 2026' and that 'no licence renewal application is required at this time'. No extension or early revocation was found on the council's pages, its decisions register (1 October to 23 November 2026), Cabinet agendas to 17 December 2026 or the London Gazette.
- Sources: https://www.southend.gov.uk/private-housing/selective-licensing-scheme, https://www.southend.gov.uk/private-housing/selective-licensing-scheme/2, https://www.southend.gov.uk/private-housing/selective-licensing-scheme/3, https://www.southend.gov.uk/private-housing/selective-licensing-scheme/4, https://www.southend.gov.uk/private-housing/selective-licensing-scheme/7, https://www.southend.gov.uk/downloads/file/6966/public-notice-designation-of-an-area-for-selective-licensing, https://www.southend.gov.uk/private-housing/private-rented-sector-housing-enforcement-policy/8, https://yoursay.southend.gov.uk/housing-selective-licensing, https://democracy.southend.gov.uk/mgDelegatedDecisions.aspx?RP=0&K=0&DM=0&HD=0&DS=1&Next=true&H=0&META=mgforthcomingdecisions&v=0&bcr=1, https://www.southend.gov.uk/news/article/3608/have-your-say-on-plans-to-renew-and-expand-landlord-licensing-in-southend, https://yoursay.southend.gov.uk/selective-licensing-consultation

### Mandatory HMO licence: Mandatory HMO licensing (national scheme, Southend fees)

- Status: In force (`in_force`)
- Area: The whole of Southend-on-Sea (national scheme).
- Fee: Published standard fee: £1,300. From the council's HMO application page: 5 lettings £1,300, paid as Part A £312 with the application and Part B £988 before the licence is issued; each additional letting over 5 costs £120. The same page also says 'There is one fee for up to 6 lets and an additional cost for each letting over 6', which conflicts with the table. No discount or instalments. Larger HMOs should call or email for a quote. No date is shown for the fees.
- Who needs one: HMOs occupied by five or more people in two or more households who share a basic amenity, including flats above commercial premises and purpose-built flats in blocks of up to two flats where five or more people share.
- Exemptions: Buildings consisting entirely of self-contained or purpose-built flats are exempt (unless amenities are not fully contained); other statutory exemptions apply.
- Apply: https://propertylicensing.southend.gov.uk/
- Confidence: Medium
- How we checked this: This is the national scheme. Southend publishes its own HMO page and fees. Southend does not run an additional HMO licensing scheme; its enforcement policy says it 'currently operates the Mandatory HMO Licensing scheme'. An HMO licence application guide is linked from the HMO page. The HMO pages do not state the licence length.
- Sources: https://www.southend.gov.uk/housing-information/houses-multiple-occupation/1, https://www.southend.gov.uk/housing-information/houses-multiple-occupation/2, https://www.southend.gov.uk/private-housing/private-rented-sector-housing-enforcement-policy/7

### Selective licence: Proposed replacement Southend selective licensing scheme

- Status: Proposed (`consultation`)
- Area: The proposal covers 12 neighbourhoods across parts of Victoria, Chalkwell, Kursaal and Milton. The proposed map and statistical areas are in sections 19 and 20 of the council’s consultation document.
- Fee: Not yet confirmed. The council proposes a two-part fee. Its final structure and amount are subject to review.
- Who needs one: Proposal for eligible privately rented homes in the specified neighbourhoods. Final property coverage depends on a designation.
- Council's map or designation: https://yoursay.southend.gov.uk/53309/widgets/161407/documents/114389/download
- Confidence: High
- How we checked this: The survey closes at 5pm on 4 January 2027. A notice published on 16 November schedules Cabinet to consider delegating the designation decision to the Executive Director, in consultation with the Cabinet Member, on 17 December 2026. It gives 15 December as the earliest possible decision date. Neither date starts a scheme. The council discusses possible implementation from April 2027, subject to consultation, approval and statutory requirements. Rechecked 23 November 2026: no designation has been made or approved. The issue history shows only 'Agenda item scheduled, Cabinet' for 17 December 2026, that meeting's agenda is not yet published, and the decisions register lists no selective licensing decision. The consultation document says 'A designation cannot come into force until three months after it has been made' and gives the earliest commencement as '3 months after close of consultation', so on the council's indicative timetable no replacement can start before about 4 April 2027, leaving a gap of at least four months after the current scheme ends on 30 November 2026. The consultation document is unchanged (version 1.0 of 23 October 2026).
- Sources: https://yoursay.southend.gov.uk/selective-licensing-consultation, https://yoursay.southend.gov.uk/53309/widgets/161407/documents/114389/download, https://www.southend.gov.uk/news/article/3608/have-your-say-on-plans-to-renew-and-expand-landlord-licensing-in-southend, https://democracy.southend.gov.uk/mgIssueHistoryHome.aspx?IId=25657&Opt=0

## Article 4 for house shares

We found no Article 4 direction on house shares in Southend-on-Sea.

No operative HMO Article 4 direction found. Cabinet in January and March 2026 asked officers to continue work on HMO policy, and the July 2026 Council meeting referred a motion for an HMO direction to Cabinet. Policy DM5.6 in the November 2026 Regulation 19 draft Local Plan says the council will investigate directions for changes from C3 dwellings to C4 small HMOs. The draft policy creates no current direction.

Council source: https://localplan.southend.gov.uk/

## HMO register

The council's public register of licensed HMOs: https://www.southend.gov.uk/HMOregister (checked 25 November 2026). It lists licensed HMOs only.

The page links a postcode search of the council's landlord licence register, which covers all its housing licences, not only HMOs.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has not been updated for the Renters' Rights Act.

Appendix 3 of the council's Private Rented Sector Housing Enforcement Policy ('Civil penalties policy for housing offences') still refers to the April 2018 guidance and a maximum of £30,000. Penalties come from a scored matrix (culpability, harm, severity and other factors): total score 1 to 5 gives £1,000, rising through £1,500, £2,500, £3,500, £5,000, £8,000, £12,000, £16,000, £20,000 and £25,000 to £30,000 for a score of 91 to 100. Failure to licence an HMO (s.72) and a selectively licensable property (s.95) are both covered. The forthcoming decisions list shows a new 'Private Sector Housing Civil Penalties Policy' (first published 5 October 2026) and a new Private Sector Housing Enforcement Policy both due for Cabinet decision on 19 January 2027 (issue pages read 23 November 2026).

Policy: https://www.southend.gov.uk/private-housing/private-rented-sector-housing-enforcement-policy/13

## Consultations

- [Southend Housing Selective Licensing (review of the selective licensing scheme and whether additional licensing for HMOs could help)](https://yoursay.southend.gov.uk/housing-selective-licensing): Closed, awaiting decision.
- [Replacement and expansion of Southend selective licensing (possible implementation from April 2027, subject to approval)](https://yoursay.southend.gov.uk/selective-licensing-consultation): Open. Closes 4 January 2027.

## Not yet confirmed

We could not settle these points when we researched Southend-on-Sea on 25 November 2026. Check them with the council before you rely on them.

- The existing notice ceases to have effect on 30 November 2026 (29 November is the last day certainly in force). The council's 23 October 2026 announcement describes expiry on 30 November and confirms a gap before any replacement. The council's ending page says all licences granted under the scheme expire on 30 November 2026; confirm treatment of letting on the cessation day itself. The consultation does not extend the current designation.
- The 'Southend Housing Selective Licensing' survey (reviewing the scheme and exploring additional licensing) shows no open or close dates and no published outcome.
- Mandatory HMO fee: the page gives £1,300 for 5 lettings plus £120 per letting over 5, but also says one fee covers up to 6 lets. The fee date and the licence length are not stated.
- The council's democracy site free-text search is blocked to automated access, so committee papers were checked through published Cabinet agendas (June 2025 to October 2026), the decisions register and the forthcoming decisions list only.
- The replacement consultation's Your Say page, updated 11 November 2026, says the survey is open until 5pm on 4 January 2027. The 23 October 2026 news article still says it closes on 31 December 2026. Confirm the final designation, boundaries, fee and start date after the council decides; possible implementation from 1 April 2027 is not an approved scheme.
- Cabinet is due to consider delegation on 17 December 2026; as of 23 November 2026 that agenda is not published and no designation has been made. Check the published decision, final consultation outcome and any signed designation before treating the proposed areas, fees or commencement date as settled. A designation cannot come into force until three months after it is made.
- Watch for a signed HMO Article 4 direction and its commencement after the November 2026 Regulation 19 draft Local Plan. The July 2026 Council motion was referred to Cabinet (https://democracy.southend.gov.uk/ieListDocuments.aspx?CId=131&MId=5096), and no operative direction was identified as of 25 November 2026.

## Landlord register

The national landlord register is separate from licensing. Southend-on-Sea is in East of England, where registration is planned from 15 January 2027 to 14 April 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/southend-on-sea (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
