# Licensing in Telford and Wrekin

> Our research lists no selective or additional licensing scheme in force in Telford and Wrekin.

Scheme statuses as of 28 November 2026.

- Checked 24 Nov 2026 (researched_at 2026-11-24, verified_at 2026-11-24)
- Region: West Midlands
- ONS code: E06000020
- Web page: https://lettance.com/councils/telford-and-wrekin
- API: https://lettance.com/api/v1/councils/telford-and-wrekin

## Licensing schemes

### Mandatory HMO licence: Mandatory HMO licensing (Housing Act 2004 Part 2), Telford & Wrekin Council

- Status: In force (`in_force`)
- Area: National scheme, applies across the whole borough.
- Fee: Published standard fee: £1,522.42. HMO licensing fees on the council's HMO page (last updated 6 November 2026): 5 occupants £1,522.42; 6 to 12 occupants £1,639.53; 13 to 20 occupants £1,756.65; 21 or more occupants £1,873.77. The HMO fees were approved by Cabinet on 14 May 2026. The May 2026 fee schedule splits these into a stage 1 application fee (£1,123.14 for up to 5 occupants) and a stage 2 fee of £399.27, payable within 14 days of the 'decision to issue'. The fee covers two pre-licence compliance visits; extra visits, pre-application advisory visits and missed appointments cost £150 each. Variation fees range from £100 to £150, and a change of licence holder needs a new application. The full fee is payable even if a shorter licence is granted. For the five-occupant band the printed stage amounts add to £1,522.41, one penny below the £1,522.42 total printed both in the schedule and on the current HMO page; confirm the amount collected at payment.
- Licence length: 5 years
- Who needs one: Privately let properties with 5 or more occupants forming 2 or more households who share or lack facilities such as a kitchen, bathroom or WC.
- Exemptions: The council lists local authority-owned properties; properties owned or managed by public bodies such as registered social landlords, health service bodies and police authorities; and properties regulated by other legislation such as care homes, nursing homes and children's homes.
- Apply: https://pp.telford.gov.uk/
- Licence conditions: https://democracy.telford.gov.uk/documents/s30839/Appendix%204%20for%20Additional%20Licensing%20of%20Houses%20in%20Multiple%20Occupation.pdf
- Confidence: High
- How we checked this: Included because the council publishes its own HMO fee. Licences are usually valid for five years and are not transferable between licence holders. The property is inspected before a licence is issued. Tacit consent does not apply. The HMO page states a civil penalty of up to £40,000. The linked licence conditions schedule still refers to a financial penalty of up to £30,000 for breaching conditions. Separately, an amenity standards document dated May 2026 is published. For licensing questions contact PrivateSectorHousing@telford.gov.uk or 01952 381818. The current page’s household examples still say that three friends, or a couple sharing with a third unrelated person, need a licence; those examples conflict with the same page’s five-occupant mandatory threshold and the published revocation of additional licensing.
- Sources: https://www.telford.gov.uk/public-protection/licensing/houses-in-multiple-occupancy-hmos/, https://democracy.telford.gov.uk/documents/s30841/Appendix%206%20for%20Additional%20Licensing%20of%20Houses%20in%20Multiple%20Occupation.pdf, https://democracy.telford.gov.uk/mgAi.aspx?ID=17142, https://democracy.telford.gov.uk/documents/s30840/Appendix%205%20for%20Additional%20Licensing%20of%20Houses%20in%20Multiple%20Occupation.pdf, https://www.telford.gov.uk/your-views-matter/consultations/current-consultations/

### Additional HMO licence: The Borough Council of Telford and Wrekin Designation for an Area for Additional Licensing of Houses in Multiple Occupation 2026

- Status: Revoked (`revoked`)
- Area: All wards within the Borough of Telford and Wrekin. The designation was revoked by the council with effect from 00:01 on 15 September 2026, so no additional licence is needed anywhere in the borough.
- Runs: Until 14 September 2026
- Fee: Not yet confirmed. No fee applies because the designation was revoked. The proposed fee for 3 to 5 occupant HMOs was £1,522.42, with a 10% early-bird discount for full and valid applications for HMOs of up to 4 occupants. Cabinet approved a 20 May to 19 August 2026 window, while the fee schedule printed 20 May to 20 August 2026. These historical application dates do not reinstate the revoked scheme.
- Who needs one: Would have applied to HMOs (s254) occupied by 3 or more people in 2 or more households, and s257 HMOs, that are not already subject to mandatory licensing. Revoked: not licensable.
- Exemptions: The designation excluded the buildings listed in its Appendix C (for example buildings managed by the council, registered providers, police, fire and NHS bodies, qualifying co-operatives and specified student accommodation), HMOs under management orders or temporary exemption notices, and HMOs needing a mandatory licence.
- Confidence: High
- How we checked this: Revoked by the council with effect from 00:01 on 15 September 2026. Cabinet considered the borough-wide scheme on 14 May 2026, and the council made the designation that day. As made, it was due to come into force on 25 August 2026 and stated that it would “cease to have effect on 24 August 2031” (the Cabinet report and resolution had proposed a 20 August 2026 start). The later addendum stated cessation at 23:59 on 24 August 2031; revocation supersedes both future end dates. An addendum dated 28 August 2026, after that date, said it would come into force on, and in any event would not be enforced before, 00:01 on 1 December 2026; the council published a public notice of this on 2 September 2026. The current HMO page says previous additional-licence applicants will be contacted with information and a refund if applicable. By an instrument made on 11 September 2026 under s60(4) Housing Act 2004, the council revoked the designation in relation to the whole designated area, and 'the Designation shall cease to have effect at 00:01 on 15 September 2026', so end_date is 14 September 2026, the last day it could have had effect. start_date is left null because the commencement date was uncertain. The stated reasons were clarity and certainty about the designation's status, operative date and effect, likely implementation timescales, avoiding unnecessary costs, and reviewing other local and national HMO measures. The council’s 15 September 2026 news release says the additional-licensing process was paused after a landlord legal challenge and that the position will be reviewed in 2027 after assessing Article 4 and national reforms. Revocation is by the council’s instrument, not a court order. The public notice of 2 September 2026 announcing the 1 December 2026 start is superseded.
- Sources: https://www.telford.gov.uk/media/qr4lhz1o/additional-licensing-revocation-instrument-final.docx, https://www.telford.gov.uk/media/e0adymbw/public-notice-final-version-to-publish.docx, https://www.telford.gov.uk/media/5uzblvtg/additional-licensing-designation-addendum-version.pdf, https://www.telford.gov.uk/public-protection/licensing/houses-in-multiple-occupancy-hmos/, https://publicnoticeportal.uk/notice/other/6a9767f422584ef243177c7a, https://democracy.telford.gov.uk/documents/s30835/Additional%20Licensing%20of%20Houses%20in%20Multiple%20Occupation.pdf, https://www.telford.gov.uk/media/w2shurbq/al-designation_.docx, https://democracy.telford.gov.uk/mgAi.aspx?ID=17142, https://newsroom.telford.gov.uk/news/telford-wrekin-council-reaffirms-robust-housing-approach

## Article 4 for house shares

Telford and Wrekin has an Article 4 direction on HMOs (shared houses). Turning a family home into a shared house may need planning permission.

- Area: The whole borough. The direction was made on 16 December 2025 and confirmed on 26 February 2026, and it comes into force on 27 February 2027. It removes Class L permitted development rights for changes of use from a dwellinghouse (C3) to a small HMO (C4, up to six residents). The council says that, with planning permission already required for HMOs of more than six residents, from that date all changes of use from a dwellinghouse into an HMO will need planning permission. Planning enquiries: planning.control@telford.gov.uk, 01952 380380.
- Takes effect: 27 February 2027

Council source: https://www.telford.gov.uk/media/a5xdas5c/article-4-direction-hmo-confirmation.pdf

## HMO register

The council's public register of licensed HMOs: https://www.telford.gov.uk/public-protection/licensing/houses-in-multiple-occupancy-hmos/ (checked 24 November 2026). It lists licensed HMOs only.

The page links a PDF register dated November 2026 (hmo-public-register-november-2026.pdf), which excludes licence applications still in progress. Queries go to PrivateSectorHousing@telford.gov.uk.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has been updated for the Renters' Rights Act.

Private Sector Housing Enforcement Policy, May 2026, approved by Cabinet on 14 May 2026 as incorporating the Renters’ Rights Act 2025 provisions. The published Cabinet resolution confirms approval of Appendix G and the revised HMO fees (https://democracy.telford.gov.uk/mgAi.aspx?ID=17142). The published policy text matches Appendix 7 to that meeting (https://democracy.telford.gov.uk/documents/s31043/Appendix%207%20for%20Additional%20Licensing%20of%20Houses%20in%20Multiple%20Occupation.pdf). Appendix 1 covers 'Civil Penalties under The Renters' Rights Act 2025 and other housing legislation', with a £40,000 statutory maximum for licensing offences. The matrix uses MHCLG statutory-guidance starting points: failure to obtain an HMO licence (s72(1)) starts at £17,000, or £13,600 to £20,400 after the landlord-type adjustment. Knowingly permitting over-occupation of an HMO starts at £20,000. The landlord-type adjustment is +20% (6 or more properties ever, 3 or more HMOs, corporate landlord or director, or significant experience) or -20% (2 or fewer properties, at most 1 HMO and limited experience). The council sets its own starting levels for licence condition breaches.

Policy: https://www.telford.gov.uk/media/nvod2k4k/enforcement-policy.pdf

## Consultations

We found no consultations when we researched Telford and Wrekin.

## Not yet confirmed

We could not settle these points when we researched Telford and Wrekin on 24 November 2026. Check them with the council before you rely on them.

- The additional licensing designation was revoked with effect from 00:01 on 15 September 2026. The council’s 15 September news release says it will revisit additional licensing in 2027; a future review is not a new designation.
- The HMO page’s licence conditions schedule still cites a £30,000 penalty for breaching conditions, while the HMO page and the adopted May 2026 enforcement policy use £40,000.
- Whether the designation had any legal effect between 25 August and 14 September 2026 remains uncertain: the addendum moving the start to 1 December 2026 is dated 28 August 2026, after the original start date.
- The current HMO page’s household examples say that three friends or a couple sharing with a third unrelated person need a licence, despite its five-occupant mandatory threshold and the revocation of additional licensing. Confirm any uncertain case with Private Sector Housing; do not rely on those examples to treat the revoked scheme as current.
- The five-occupant fee schedule prints stage 1 £1,123.14 and stage 2 £399.27, which add to £1,522.41, but it and the current HMO page give the total as £1,522.42. Confirm the amount collected at payment.
- The council's current HMO page (last updated 6 November 2026) links the revocation notice and instrument; the council's 15 September 2026 news release says the position will be reviewed in 2027. Its general consultation directory says it does not list every consultation; no replacement licensing designation or current housing-licensing consultation is confirmed in the sources reviewed.
- The Article 4 confirmation PDF (https://www.telford.gov.uk/media/a5xdas5c/article-4-direction-hmo-confirmation.pdf) is an image-only scan whose text could not be extracted on 2026-11-24. The direction's dates (made 16 December 2025, confirmed 26 February 2026, in force 27 February 2027) were re-read on the council's HMO page, last updated 6 November 2026.

## Landlord register

The national landlord register is separate from licensing. Telford and Wrekin is in West Midlands, where registration is planned from 15 December 2026 to 14 March 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/telford-and-wrekin (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
