# Licensing in Wandsworth

## Do I need a selective licence in Wandsworth?

Only if the home is in one of the scheme's 7 wards. Selective licensing in Wandsworth runs in 7 wards. Check the postcode below, then confirm the address with the council before you apply.

Checked 24 Nov 2026. Council source: https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-check/

> Wandsworth has selective licensing in 7 wards and additional HMO licensing across the whole council area.

Scheme statuses as of 28 November 2026.

- Checked 24 Nov 2026 (researched_at 2026-11-24, verified_at 2026-11-24)
- Region: London
- ONS code: E09000032
- Web page: https://lettance.com/councils/wandsworth
- API: https://lettance.com/api/v1/councils/wandsworth

## Licensing schemes

### Selective licence: London Borough of Wandsworth Designation 1 for Areas for Selective Licensing 2025

- Status: In force (`in_force`)
- Area: Four wards in the south of the borough (Designation 1, shown yellow on the Annex A map). 4 wards named in the scheme: Furzedown, Tooting Bec, South Balham, Tooting Broadway. Ward boundaries: current Wandsworth wards (names match the ONS 2026 ward lookup).
- Runs: 1 July 2025 to 29 June 2030. The council notice says it ceases to have effect on 30 June 2030
- Fee: Published standard fee: £885. Part A £529, Part B £356, total £885. Discounts: multi-dwelling £104 off Part A; EPC B or above £104 off Part B; EPC C £52 off Part B; provision to social rented sector £104 off Part B; Gold Standard £142 (40%) off Part B; accredited landlord £104 off Part B. The early bird discount (£159, 30% off Part A) for Designation 1 ended on 31 December 2025. Discounts are lost after two requests for documents or a warning letter for failure to license. Fee page updated 23/09/2026. The current fees table gives the discounts above, but prose on the same page still quotes £100 for EPC B/accreditation and £50 for EPC C; confirm the discount before paying. Multi-dwelling applications must cover homes in the same building, under the same owner and management, submitted together. Part A is payable on application and is not refunded for a refused, rejected or withdrawn application; Part B is payable when the licence is to be granted.
- Licence length: 5 years
- Who needs one: Every privately rented home in the designated wards that is not licensable under the mandatory or additional HMO schemes, for example single households and two sharers.
- Exemptions: Mandatory HMOs; HMOs licensable under the additional scheme; tenancies granted by a registered social landlord; properties under an interim or final management order; temporary exemptions (s.86); tenancies exempt under SI 2006/370. A temporary exemption notice lasts 3 months, at most 2 can be issued.
- Apply: https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/apply-property-licence/
- Licence conditions: https://www.wandsworth.gov.uk/media/nrjp3c0m/selective_licensing_conditions.pdf
- Council's map or designation: https://maps.wandsworth.gov.uk/map/Aurora.svc/run?script=%5CAurora%5Cpublic_Designation_Selective_Licensing_WBC.AuroraScript%24&nocache=7c5c3e21-41a6-591f-a510-caa671b217f4&resize=always
- Confidence: High
- How we checked this: In force 1 July 2025, ceases 30/06/2030. The notice contradicts itself: it says the designation was 'made on 22 July 2024' but 'approved by Cabinet decision taken on the 03 February 2025', and that confirmation is no longer required while also saying the Secretary of State confirmed the start date. The council links the PRS Discretionary Licensing Paper No. 25-10. Licences usually last 5 years, but usually 1 year if planning permission for HMO use is needed or has been refused. The notice says the designation ceases to have effect on 30 June 2030, before the fifth anniversary of commencement; 29 June is the last day of certain coverage. Check the position with the council for 30 June 2030. The council's FAQ still quotes the older selective/additional fees of £850/£1,450 and says Phase 2 needs approval. Use the current itemised fees and designated scheme notice. The current licensing contact is privatehousing@wandsworth.gov.uk; the notices retain privatehousing@merton.gov.uk and 020 8545 3025.
- Sources: https://www.wandsworth.gov.uk/media/nqip4qnq/public_notice_on_selective_licencing_designation_1.pdf, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-check/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-fees-discounts/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licences-faq/, https://democracy.wandsworth.gov.uk/mgAi.aspx?ID=76456

### Selective licence: London Borough of Wandsworth Designation 2 for Areas for Selective Licensing 2026

- Status: In force (`in_force`)
- Area: Designation 2 (Phase 2), shown orange on the Annex B map. 3 wards named in the scheme: East Putney, Northcote, West Putney. Ward boundaries: current Wandsworth wards (names match the ONS 2026 ward lookup).
- Runs: 1 April 2026 to 30 March 2031. The council notice says it ceases to have effect on 31 March 2031
- Fee: Published standard fee: £885. Part A £529, Part B £356, total £885, with the same discounts as Designation 1. The Designation 2 early bird discount (£159, 30% off Part A) ran from 1 April 2026 to 1 October 2026 and has now ended. The current fees table gives the discounts above, but prose on the same page still quotes £100 for EPC B/accreditation and £50 for EPC C; confirm the discount before paying. Multi-dwelling applications must cover homes in the same building, under the same owner and management, submitted together. Part A is payable on application and is not refunded for a refused, rejected or withdrawn application; Part B is payable when the licence is to be granted.
- Licence length: 5 years
- Who needs one: Every privately rented home in East Putney, Northcote and West Putney wards that is not licensable under the mandatory or additional HMO schemes.
- Exemptions: Same as Designation 1: mandatory and additional HMOs; registered social landlord tenancies; management orders; temporary exemptions; SI 2006/370 exemptions.
- Apply: https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/apply-property-licence/
- Licence conditions: https://www.wandsworth.gov.uk/media/nrjp3c0m/selective_licensing_conditions.pdf
- Council's map or designation: https://maps.wandsworth.gov.uk/map/Aurora.svc/run?script=%5CAurora%5Cpublic_Designation_Selective_Licensing_WBC.AuroraScript%24&nocache=7c5c3e21-41a6-591f-a510-caa671b217f4&resize=always
- Confidence: High
- How we checked this: Cabinet decided on 1 December 2025; the designation was made on 1 December 2025, came into force on 1 April 2026, and ceases on 31 March 2031. The notice is signed and dated 5 December 2025. Secretary of State confirmation was not required under the 23 December 2024 general approval. The older URL 'public_notice_on_selective_licencing.pdf' now also serves the Designation 2 notice. The notice gives the Private Sector Housing Team contact as privatehousing@merton.gov.uk (Morden), while the current licensing pages give privatehousing@wandsworth.gov.uk. The notice says the designation shall cease to have effect on 31 March 2031, before the fifth anniversary of commencement; 30 March is the last day of certain coverage. Check the position with the council for 31 March 2031.
- Sources: https://wandsworth.gov.uk/media/jisc02og/public_notice_on_selective_licencing_delegation_2.pdf, https://www.wandsworth.gov.uk/media/ps2icr1d/public_notice_on_selective_licencing.pdf, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-check/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-fees-discounts/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licences-faq/

### Additional HMO licence: The London Borough of Wandsworth Designation of an Area for Additional Licensing of Houses in Multiple Occupation 2025

- Status: In force (`in_force`)
- Area: The entire London Borough of Wandsworth (Annex A map).
- Runs: 1 July 2025 to 29 June 2030. The council notice says it ceases to have effect on 30 June 2030
- Fee: Published standard fee: £1,507. Part A £903, Part B £604, total £1,507. Discounts: multi-dwelling £104 off Part A; EPC B or above £104 off Part B; EPC C £52 off Part B; provision to social rented sector £104 off Part B; Gold Standard £242 (40%) off Part B; accredited landlord £104 off Part B. The early bird discount ended on 31 December 2025. Fee page updated 23/09/2026. The current fees table gives the discounts above, but prose on the same page still quotes £100 for EPC B/accreditation and £50 for EPC C; confirm the discount before paying. Multi-dwelling applications must cover homes in the same building, under the same owner and management, submitted together. Part A is payable on application and is not refunded for a refused, rejected or withdrawn application; Part B is payable when the licence is to be granted.
- Licence length: 5 years
- Who needs one: HMOs (s.254) occupied by 3 or more people from 2 or more households that are not mandatory HMOs. The council page says this includes HMOs let to at most 4 people sharing a bathroom or kitchen, and flats in multiple occupation in purpose-built blocks of 3 or more flats.
- Exemptions: Mandatory HMOs; properties under an interim or final management order; temporary exemptions (s.62); Schedule 14 buildings; section 257 converted blocks (each privately rented flat in a selective ward may need its own selective licence unless covered by an HMO licence or another exemption).
- Apply: https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/apply-property-licence/
- Licence conditions: https://www.wandsworth.gov.uk/media/iirefigo/additional_licensing_conditions.pdf
- Confidence: High
- How we checked this: The notice says it was 'made on 22 July 2024', approved by Cabinet on 03 February 2025, in force 01/07/2025, and ceases 30/06/2030. This is Wandsworth's first additional scheme. The notice says the designation ceases to have effect on 30 June 2030, before the fifth anniversary of commencement; 29 June is the last day of certain coverage. Check the position with the council for 30 June 2030. The current council guidance and FAQ exclude section 257 converted blocks from additional licensing. The notice's paragraph 7(e) describes the exclusion with extra three-storey, three-flat and common-ownership/control wording, while paragraph 7's positive scope refers only to section 254 HMOs. Confirm the building's classification with the council; an individually shared flat may separately require an HMO licence.
- Sources: https://www.wandsworth.gov.uk/media/klpjttfb/public_notice_on_additional_licencing_across_wandsworth.pdf, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-check/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-fees-discounts/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licences-faq/, https://democracy.wandsworth.gov.uk/mgAi.aspx?ID=76456

### Mandatory HMO licence: Mandatory HMO licensing (national scheme, Wandsworth fees)

- Status: In force (`in_force`)
- Area: The whole borough (national scheme).
- Fee: Published standard fee: £1,711. Priced by bedrooms (units of accommodation or households). Part B is £675 in every case. 3 units £1,711 (A £1,036); 4 units £1,769; 5 units £1,827; 6 units £1,885; 7 units £1,943; 8 units £2,001; 9 units £2,059; 10 or more £2,117, plus a pro rata fee on the same scale for each unit above 10. standard_gbp is the lowest band. Discounts: multi-dwelling £104 off A; EPC B or above £104 off B; EPC C £52 off B; social rented sector £104 off B; Gold Standard 40% off B; accredited £104 off B. The current fees table gives the discounts above, but prose on the same page still quotes £100 for EPC B/accreditation and £50 for EPC C; confirm the discount before paying. Multi-dwelling applications must cover homes in the same building, under the same owner and management, submitted together. Part A is payable on application and is not refunded for a refused, rejected or withdrawn application; Part B is payable when the licence is to be granted.
- Licence length: 5 years
- Who needs one: HMOs with at least 5 tenants from 2 or more households sharing toilet, bathroom or kitchen facilities.
- Exemptions: Statutory exemptions under Schedule 14, Housing Act 2004 (e.g. public-sector controlled buildings, some student buildings, some owner-occupied buildings). The council places HMO flats in purpose-built blocks of three or more flats within its additional licensing scheme.
- Apply: https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/apply-property-licence/
- Licence conditions: https://www.wandsworth.gov.uk/media/cvgkcecx/mandatory_licensing_conditions.pdf
- Confidence: High
- How we checked this: This is the national scheme. The council publishes its own page and fees.
- Sources: https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-check/, https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-fees-discounts/

## Article 4 for house shares

We found no Article 4 direction on house shares in Wandsworth.

The council's published Article 4 Directions list contains no C3-to-C4 HMO direction. It lists eight conservation-area directions and change-of-use directions for B1a offices to C3, Class E to C3, and public houses and bars (page updated 23 October 2025). The current licence-check page separately says planning permission is needed for an HMO of seven or more people. Licensing and planning permission are separate requirements.

Council source: https://www.wandsworth.gov.uk/planning/permitted-development-and-article-4-directions/article-4-directions/

## HMO register

The council's public register of licensed HMOs: https://wandsworth.gov.uk/housing/private-housing/private-housing-landlords/houses-in-multiple-occupation-hmos/hmo-register (checked 24 November 2026). It lists licensed HMOs only.

Basic details are searchable online. Owner names and addresses are only in the full register, which costs £50 and comes as paper or PDF, not Excel or CSV.

## Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has been updated for the Renters' Rights Act.

'Civil penalties under the Renters' Rights Act 2025 and other housing legislation' is linked from the council's Enforcement and licence conditions page (updated 23/09/2026), alongside the 'Private Sector Housing Enforcement Policy 2026'. The method has 5 steps: MHCLG starting point, Landlord Type ±20%, aggravating and mitigating factors, financial considerations, then totality. The policy uses financial considerations, including rental income and assets, rather than a stated fixed local rent-uplift formula. Failure to obtain a selective licence starts at £12,000 (£9,600 downward / £14,400 upward). Failure to obtain an HMO licence starts at £17,000 (£13,600 / £20,400). The statutory maximum is £40,000, or £7,000 for certain tenancy breaches. There is a 15% discount when the penalty is paid in full within the final-notice period, normally 28 days beginning the day after notice. An appeal does not extend or suspend this discount period; a landlord appealing may still qualify by paying in full within it. Note: the designation notices still cite a £30,000 maximum. The enforcement page (https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-conditions/) links the 2026 enforcement policy at https://www.wandsworth.gov.uk/media/r3khsejw/private_sector_housing_enforcement_policy.pdf. The application page still links an older enforcement policy labelled October 2025 at https://www.wandsworth.gov.uk/media/f4jjkdjx/private_sector_housing_enforcement_policy.pdf; the council has not reconciled these links.

Policy: https://www.wandsworth.gov.uk/media/skudfvdi/civil_penalties_under_housing_legislation.pdf

## Consultations

- [Additional HMO & Selective Licensing Consultation](https://haveyoursay.citizenspace.com/wandsworthecs/ahsl24/): Approved. Closed 14 October 2024.

## Not yet confirmed

We could not settle these points when we researched Wandsworth on 24 November 2026. Check them with the council before you rely on them.

- The adoption date of the Renters' Rights Act civil penalty policy and Private Sector Housing Enforcement Policy 2026 remains unconfirmed; the council publishes them as its current enforcement documents but the civil penalty PDF does not state an adoption date. The application page still links the older October 2025 enforcement policy, while the enforcement page links the 2026 policy; confirm which policy applies to an individual enforcement case.
- The Designation 1 and additional notices give the 'made' date as 22 July 2024 but Cabinet approval as 3 February 2025. Designation 1 also says both that Secretary of State confirmation was not required and that the Secretary of State confirmed the start date. The dates in force are consistent across sources.
- The fees page's itemised tables give £104 for accreditation and EPC B or above and £52 for EPC C, while its prose still gives £100 and £50. The FAQ gives older selective/additional totals (£850/£1,450) and still describes Phase 2 as unapproved. Confirm actual discounts with privatehousing@wandsworth.gov.uk; the current fee table totals are £885 selective and £1,507 additional.
- The additional designation's paragraph 7(e) adds three-storey, three-flat and common-ownership/control wording to its section 257 exclusion, while the current council guidance and FAQ exclude section 257 blocks generally and the designation's positive scope covers section 254 HMOs. Confirm classification where a converted building's circumstances are uncertain.
- The designated final dates are cessation dates before the fifth anniversaries: 30 June 2030 for Designation 1/additional and 31 March 2031 for Designation 2. The final day of certain coverage is the previous day; ask the council about licensing on the cessation day itself.

## Landlord register

The national landlord register is separate from licensing. Wandsworth is in London, where registration is planned from 15 July 2027 to 14 October 2027. The regulations are still in draft. Read about the register: https://lettance.com/register

---

From Lettance: https://lettance.com/councils/wandsworth (catalogue edition 28 November 2026). This is information, not legal advice. Check the linked sources, and the council's own pages, before you act.
