← London

Licensing in Haringey

Do I need a selective licence in Haringey?

Only if the home is in one of the scheme's 14 wards. Selective licensing in Haringey runs in 14 wards from 17 November 2022 to 16 November 2027. Check the postcode below, then confirm the address with the council before you apply.

Checked 24 Nov 2026 · Council source

Haringey has selective licensing in 14 wards and additional HMO licensing across the whole council area.

Scheme statuses as of .

Check an address in Haringey

The postcode centre gives an approximate ward. Check the council map for the exact address.

What changed since your last check?

Our Haringey council archive starts on . See which of your property records we can compare for free.

Landlord register: London is planned to open on 15 July 2027. Dates and email reminders

Licensing, ward by ward

Select a ward to see its name and licensing.

  • Selective licensing area14
  • Additional HMO licensing area7

Additional HMO licensing also covers the whole council area.

Current ward boundaries from ONS. Some homes are exempt, so check your postcode and the scheme details below.

Selective licensing
14 wards
Additional HMO licensing
Yes, whole council area
Article 4 on house shares
Yes
Consultation
None open

Licensing schemes

  • Selective licence

    In force

    London Borough of Haringey Council Designation of an Area for Selective Licensing 2022

    Area

    14 wards, delineated and edged red on the Annex A map in the designation notice.

    14 wards named in the scheme:

    • Bounds Green
    • Bruce Castle
    • Harringay
    • Hermitage & Gardens
    • Noel Park
    • Northumberland Park
    • Seven Sisters
    • South Tottenham
    • St Ann’s
    • Tottenham Central
    • Tottenham Hale
    • West Green
    • White Hart Lane
    • Woodside

    Ward boundaries: 2022 wards (names such as Hermitage & Gardens, South Tottenham and Tottenham Central belong to the ward pattern introduced in May 2022; the designation itself does not state a boundary date)

    Runs
    17 November 2022 to 16 November 2027
    Fee

    Published standard fee: £705.84

    Part A £411.57 on application; Part B £294.27 on approval (no licence until paid). Discounts, which can be combined: accredited licence holder (LLAS, NRLA, UKALA, or member of ARLA, RICS, Safeagent) £50 off Part B; EPC C or above £50 off Part B (both: £605.84); owners or managers of 3+ rented flats in the same block £75 off Part A for the 2nd and later flats. Paper applications add £100 to Part A. Applications without a valid EPC get a 1-year licence. The 2026 to 2027 fee structure PDF shows the same figures as the fees page (both re-read 24 November 2026; the PDF lists paper applications as a '£100 Additional Charge to Part A Licence fee').

    Who needs one
    All privately rented homes in the 14 wards let to a single person, 2 people, or a single household (e.g. a family), unless the property needs an HMO licence.
    Exemptions
    HMOs licensable under Part 2; registered social landlord tenancies; Interim/Final Management Orders; temporary exemption notices (s86); tenancies exempt under SI 2006/370.
    How we checked this

    Cabinet made the designation on 8 March 2022. It needed Secretary of State confirmation under the pre-2024 rules; the Minister for Rough Sleeping and Housing confirmed it on 17 August 2022. In force 17 November 2022. The notice says 'The designation shall cease to have effect on 17 November 2027', the fifth anniversary of its start, so end_date is 16 November 2027, the last day in force. A council procurement notice published 12 January 2026 seeks specialists to review the scheme and test whether a renewed scheme is feasible before the designation ends. The council's statutory forward plan (published 9 October 2026) lists a key decision for Cabinet on 8 December 2026: 'Request to Commence Statutory Public Consultation – Proposed New Selective Property Licensing Scheme 2027-2032'. As of 24 November 2026 no consultation has opened and no new designation has been made, so nothing yet replaces this scheme after 16 November 2027: the forward plan issue still reads 'Decision status: For Determination', the Cabinet decisions list for October to November 2026 (including Cabinet on 10 November 2026) has no licensing item, and the 8 December 2026 Cabinet page says 'The agenda will be displayed in the week before the meeting'. The designation notice still cites a £30,000 penalty and Section 21. Licence terms can be cut by up to 4 years for failed EPC, council tax arrears, or past HMO licence breaches, and by 1 year for not applying voluntarily.

  • Additional HMO licence

    In force

    The London Borough of Haringey Designation of an area for Additional Licensing of Houses in Multiple Occupation No 4, 2024

    Area

    Whole area of the London Borough of Haringey.

    Runs
    17 June 2024 to 15 June 2029. The council notice says it ceases to have effect on 16 June 2029
    Fee

    Published standard fee: £1,411.68

    HMO licence: Part A £641.48 on application, Part B £770.20 before issue (total £1,411.68). £50 off Part A for an accredited licence holder; £50 off Part B for a compliant EPC (both: £1,311.68). £50 added to each of Part A and Part B for every unit above 5. Paper or assisted applications +£100 on Part A. No refunds on refusal, withdrawal or revocation. The page does not say whether this fee covers both additional and mandatory HMOs. Rechecked 23 November 2026: the council's HMO licensing fees and periods page returned HTTP 503 (a 'Browser Verification' bot challenge) with and without www., so the 'Applying for an HMO licence' page is cited instead. It still says 'A £641.48 fee will be paid on application, and a further £770.20 fee will be taken before your licence is issued. The total fee for licensing an HMO is £1,411.68.' It refers to the fees page for 'Further charges and discounts', so the £50 discounts, per-unit additions and paper-application charge above could not be re-read that day. Rechecked 24 November 2026: the fees page again returned HTTP 503 ('Browser Verification'), with and without www. and with a query string; the 'Applying for an HMO licence' page still gives £641.48 + £770.20 = £1,411.68.

    Who needs one
    All HMOs as defined by s254 that are not mandatory HMOs: rented to at least 3 people not from the same household sharing facilities, plus s257 converted blocks (per the council's consultation page).
    Exemptions
    Mandatory HMOs and statutory exemptions/exceptions (Schedule 14).
    How we checked this

    Designated 12 March 2024 under the 2015 general approval. The public notice says 'The designation shall come into force on 17th June 2024 and shall cease to have effect on 16th June 2029', the day before the fifth anniversary, so the last certainly covered day is 15 June 2029 and 16 June 2029 is a day to check with the council. It replaced the 2019 borough-wide scheme, which ended 26 May 2024 (gap of about 3 weeks). HMOs without planning consent usually get a 1-year licence. HMO licence terms can be cut by up to 4 years for failing to apply voluntarily, complaints, planning breaches, council tax arrears, or safety risks. The council's conditions page says all HMOs licensed under the 2024-2029 additional scheme must comply with the HMO Licensing Conditions 2024-2029.

  • Mandatory HMO licence

    In forceMedium confidence

    Mandatory HMO licensing (national scheme, Haringey fees)

    Area

    Entire borough (national scheme).

    Fee

    Published standard fee: £1,411.68

    The council's HMO fee page shows a single 'Full HMO licensing fee' of £1,411.68 (Part A £641.48 + Part B £770.20) plus £50 per unit above 5 on each part. It is not explicit that this applies to mandatory as well as additional HMOs. Rechecked 23 November 2026: the fees page returned HTTP 503 (bot challenge), so the 'Applying for an HMO licence' page is cited instead. It still says 'The total fee for licensing an HMO is £1,411.68' (£641.48 on application plus £770.20 before issue), without distinguishing mandatory from additional HMOs. The £50 per-unit additions above could not be re-read that day. Rechecked 24 November 2026 with the same result (fees page HTTP 503; total and parts unchanged on the applying page).

    Who needs one
    HMOs occupied by 5 or more people forming 2 or more households sharing amenities.
    How we checked this

    Fee attribution to mandatory HMOs is inferred from the page heading; confirm with the council.

Haringey's HMO register

Every council keeps a public register of the HMOs it has licensed. The council publishes it as a register you can search online. It lists licensed HMOs only, so a shared house that is missing from it may still need a licence.

The online search covers all of Haringey's property licensing schemes and the council says it is not the full register. The full HMO register is seen by appointment at the council's offices.

Haringey's HMO register on the council's website

Checked 24 November 2026

Article 4 for house shares

Haringey has an Article 4 direction on HMOs (houses in multiple occupation, or shared houses). Turning a family home into a shared house may need planning permission.

Area
Specific areas: the direction area shown on the council map, which the council lists as the wards of Bounds Green, Bruce Castle, Harringay, Hermitage and Gardens, Northumberland Park, Noel Park, St Ann’s, Seven Sisters, South Tottenham, Tottenham Central, Tottenham Hale, West Green, White Hart Lane and Woodside. Not borough-wide.
Takes effect
30 Nov 2013

Council source

Civil penalty policy

The council's policy sets how it decides the size of a fine. The version we found has not been updated for the Renters' Rights Act.

Private Sector Housing Enforcement Policy (March 2025), revised after Leicester v Morjaria; maximum £30,000. Four stages: a starting level by seriousness, portfolio size/experience, aggravating and mitigating factors (rarely more than +/-£5,000 in total), then discounts. Failure to license a mandatory HMO is 'Very Serious', starting at £17,500 (£12,500 for one HMO plus at most one other dwelling; £22,500 for 6+ dwellings, 3+ HMOs, or demonstrated experience). Failure to license an additional HMO or selective property is 'Serious', starting at £12,500 (£7,500 for 1-2 dwellings; £17,500 for a large portfolio). A 15% discount applies if the final-notice penalty is paid within the specified period (normally 28 days). No Renters' Rights Act update was found. The statutory forward plan lists a key decision for Cabinet on 8 December 2026 to approve a revised private sector housing enforcement policy for the Renters' Rights Act 2025, 'including updates to the Civil Penalty Notices provision' (minutes.haringey.gov.uk, first published 2 September 2026). Until then the March 2025 policy is the published one; on 24 November 2026 the issue still reads 'Decision status: For Determination' and the selective licensing page still links the March 2025 policy.

Haringey's civil penalty policy

Consultations

We found no consultations when we researched Haringey.

Not yet confirmed

We could not settle these points when we researched Haringey. Check them with the council before you rely on them.

  • Not yet confirmed

    Selective designation's last day in force is 16 November 2027 (it ceases to have effect on 17 November 2027). Cabinet is due on 8 December 2026 to decide whether to start statutory consultation on a proposed new selective scheme for 2027-2032 (forward plan issue minutes.haringey.gov.uk). Checked cabinet agendas from 11 November 2025 to 10 November 2026, the decisions list for 1 October to 24 November 2026 and the housing consultations page on 24 November 2026: no consultation open and no new designation; the 8 December 2026 agenda is not yet published. Recheck after the 8 December 2026 Cabinet; the new scheme's wards, fees and dates are unknown until then.

  • Not yet confirmed

    Whether Haringey has adopted a civil penalty policy updated for the Renters' Rights Act 2025 (£40,000 maximum): a revised enforcement policy is due at Cabinet on 8 December 2026 (minutes.haringey.gov.uk); recheck after that meeting. Still 'For Determination' on 24 November 2026.

  • Not yet confirmed

    Whether the £1,411.68 HMO fee applies to mandatory as well as additional HMO licences. The independent check (2026-10-14) could not resolve this. The HMO conditions page applies the 2024-2029 conditions PDF to HMOs under the additional scheme; it does not say whether mandatory HMOs use the same conditions, so the mandatory conditions_url stays null.

  • Not yet confirmed

    The additional HMO fee structure PDF was not fetched; HMO figures are from the council's web page.

  • Not yet confirmed

    Not independently re-checked (verification of 2026-10-14): the £1,411.68 HMO fee (Part A £641.48 + Part B £770.20). The live fee page still returns a 503 bot challenge to automated access (curl and WebFetch, 2026-11-03; curl again on 24 November 2026); the latest archived copy (6 Jan 2026) shows £1,360 (Part A £618 + Part B £742), and the recorded figures are exactly 3.8% higher, which fits an April 2026 uplift.

  • Not yet confirmed

    The HMO licensing fees and periods page returned HTTP 503 (bot challenge) to curl on 23 November 2026, with and without www., and could not be re-read. The HMO landing page still links it as 'Licensing fees and discounts'. The total fee and its two parts were re-read on the 'Applying for an HMO licence' page; the accreditation and EPC discounts, the £50 per unit above 5 and the £100 paper-application charge rest on the earlier reading of the fees page. Same result on 24 November 2026 (HTTP 503 with and without www. and with a query string; guessed HMO fee-structure PDF paths returned 404).

The landlord register in Haringey

The national landlord register is separate from council licensing: every landlord letting a home in Haringey on an assured or regulated tenancy will need to register themselves and each home. Haringey is in London. These dates are planned and the regulations are still in draft. Read about the register

London opens
Early registration from 15 Dec 2026
Deadline
Announced fee
£65per property, every year

Get an email when London opens

At most three emails: before registration opens, when your region opens and a month before its deadline. We keep only your email and region.

Use the Haringey research

Your software or AI assistant can read this council’s public research, including its sources and open questions. A property assessment here covers England’s national mandatory HMO criteria. Local schemes still need checking with the council.