Licensing in Islington
Do I need a selective licence in Islington?
Only if the home is in one of the scheme's 10 wards. Selective licensing in Islington runs in 10 wards. Check the postcode below, then confirm the address with the council before you apply.
Checked 23 Nov 2026 · Council source
Islington has selective licensing in 10 wards and additional HMO licensing across the whole council area.
Scheme statuses as of .
Check an address in Islington
The postcode centre gives an approximate ward. Check the council map for the exact address.
What changed since your last check?
Our Islington council archive starts on . See which of your property records we can compare for free.
Landlord register: London is planned to open on 15 July 2027. Dates and email reminders
Licensing, ward by ward
Select a ward to see its name and licensing.
- Selective licensing area10
- Additional HMO licensing area7
Additional HMO licensing also covers the whole council area.
Current ward boundaries from ONS. Some homes are exempt, so check your postcode and the scheme details below.
- Selective licensing
- 10 wards
- Additional HMO licensing
- Yes, whole council area
- Article 4 on house shares
- None found
- Consultation
- None open
Licensing schemes
Selective licence
In forceLondon Borough of Islington Designation of an Area for Selective Licensing 2024
- Area
Finsbury Park, Tollington and Hillrise wards.
3 wards named in the scheme:
- Finsbury Park
- Tollington
- Hillrise
Ward boundaries: 2022 wards (current)
- Runs
- 20 May 2024 to 18 May 2029. The council notice says it ceases to have effect on 19 May 2029
- Fee
Published standard fee: £850
Part A £450 on application + Part B £400 if a draft licence is issued = £850 per property. Part B discounts: £75 accredited landlord; £50 EPC A-C; £25 renewal with no gap. Discounts are cumulative. Fees PDF served with Last-Modified 29 January 2026; the web page shows no date.
- Who needs one
- All privately rented properties occupied by a single person, two people sharing (regardless of relationship), or any number of persons forming a single household (family).
- Exemptions
- HMOs (mandatory or additional), owner-occupied properties and social rented properties (local authority or housing association owned or managed).
How we checked this
Designated 19 February 2024 under the 2015 General Approval. Replaced the 2020 selective scheme (former Finsbury Park ward), which was revoked on 20 May 2024. The 2026 designation confirms this scheme is still in force alongside the new one. The current council licence-type page, fetched 2 November 2026, correctly lists Finsbury Park, Hillrise and Tollington as the current selective wards and separates the seven wards joining from 23 November 2026. The 2024 public notice says the scheme will 'cease to have effect on 19 May 2029'. Its date-only cessation falls before the fifth anniversary of commencement: the last certainly covered day is 18 May 2029; check with the council on the quoted cessation day, 19 May, rather than assuming certain coverage or automatic expiry on it. Re-read 3 November 2026: the 2024 public notice still says the scheme 'will come into force on 20 May 2024 and unless revoked beforehand or extended will cease to have effect on 19 May 2029', and the licence-type page lists Finsbury Park, Hillrise and Tollington as wards where 'selective licensing is already in place'. Rechecked 23 November 2026: the 2024 public notice is unchanged (Last-Modified 29 February 2024) and the licence-type page still lists Finsbury Park, Hillrise and Tollington under 'Selective licensing is already in place'. The 2026 designation is a separate instrument that says the 2024 designation 'is still in force'; it neither revokes nor varies it, and no revocation notice was found.
Sources
- islington.gov.uk: 2024 public notice selective licensing (PDF)
- islington.gov.uk: property licensing
- islington.gov.uk: how to apply for a property licence in islington
- islington.gov.uk: property licensing fees (PDF)
- islington.gov.uk: revocation of 2020 selective licensing scheme (PDF)
- islington.gov.uk: check what type of property licence you need
Selective licence
In forceLondon Borough of Islington Designation of an Area for Selective Licensing 2026
- Area
Seven wards indicated on the map in Appendix A of the designation. Together with the 2024 designation, selective licensing covers 10 of Islington's 17 wards.
7 wards named in the scheme:
- Barnsbury
- Caledonian
- Tufnell Park
- Mildmay
- Highbury
- Junction
- Laycock
Ward boundaries: 2022 wards (current)
- Runs
- 23 November 2026 to 22 November 2031
- Fee
Published standard fee: £850
Part A £450 + Part B £400 = £850 per property (fees PDF and how-to-apply page, re-read 3 November 2026), with the same Part B discounts (£75 accredited, £50 EPC A-C, £25 renewal with no gap), added together where more than one applies. Applications opened 7 September 2026; the council says landlords in the seven wards must apply by 23 November 2026.
- Who needs one
- All private rented properties occupied by a single person, two people sharing (regardless of relationship), or any number of persons forming a single household (family).
- Exemptions
- HMOs (mandatory or additional), owner-occupied properties and social rented properties.
How we checked this
Designation made 21 August 2026 by the Director of Environment and Public Safety under delegated power, after Executive agreement, under the General Approval 2024. In force from 12.00am on 23 November 2026 until 11.59pm on 22 November 2031. The designation says the financial penalty 'currently can be up to £40,000'. The conditions_url shown is the May 2024 selective conditions; no 2026-specific selective conditions document was found. Re-read 3 November 2026 (signed designation served with Last-Modified 21 August 2026): it 'is made on 21st August 2026 and shall come into force at 12.00am on 23rd November 2026' and 'shall cease to have effect at 11.59pm on 22nd November 2031', designating 'the wards ... known as Barnsbury, Caledonian, Tufnell Park, Mildmay, Highbury, Junction, and Laycock'; 'Online applications for the licensing scheme will open from 7th September 2026. To apply visit propertylicensing.islington.gov.uk'. The council's licence-type page lists the same seven wards and says 'If your property is in one of these wards, you must apply by 23 November 2026.' The fees PDF (Last-Modified 29 January 2026) prices a selective property at Part A £450 plus Part B £400, 'Total fee payable £850 (minus any discounts.)', and the how-to-apply page gives 'selective licence – £850 for the whole property' with the same £75, £50 and £25 Part B discounts. Re-read 10 November 2026, still on track for 23 November 2026: the signed designation (unchanged, Last-Modified 21 August 2026) still 'shall come into force at 12.00am on 23rd November 2026' and 'shall cease to have effect at 11.59pm on 22nd November 2031' for the same seven wards; the licence-type page still says 'If your property is in one of these wards, you must apply by 23 November 2026'; the how-to-apply page still gives 'selective licence – £850 for the whole property' with the same Part B discounts and no early-bird rate; and propertylicensing.islington.gov.uk still offers 'Apply for a new property licence'. The Executive approved the licence conditions in Appendix 3 on 23 October 2025. The selective conditions begin on PDF page 137 of the combined appendices. Check the conditions on the issued licence and any subsequent variation. Rechecked 23 November 2026, the commencement day: the signed designation is unchanged (Last-Modified 21 August 2026) and still 'shall come into force at 12.00am on 23rd November 2026' and 'shall cease to have effect at 11.59pm on 22nd November 2031' for 'Barnsbury, Caledonian, Tufnell Park, Mildmay, Highbury, Junction, and Laycock'. The statutory section 83 notice published in the Islington Gazette on 27 August 2026 (Public Notice Portal copy) gives the same dates and wards. No revocation, variation or postponement was found: the council's licensing pages, the Executive agendas for 22 October and 26 November 2026, delegated decisions published 1 August to 23 November 2026 and a London Gazette search show none. The licence-type page still lists the seven wards and says 'you must apply by 23 November 2026'; the how-to-apply page still gives 'selective licence – £850 for the whole property' with the £75, £50 and £25 Part B discounts; the fees PDF is unchanged (Last-Modified 29 January 2026); and propertylicensing.islington.gov.uk still offers 'Apply for a new property licence'. Status is set to in_force from the designation's own commencement wording; the council had published no separate start announcement on its licensing pages.
Sources
- islington.gov.uk: islington designation of an area for selective licensing 2026 (PDF)
- islington.gov.uk: property licensing
- islington.gov.uk: check what type of property licence you need
- islington.gov.uk: how to apply for a property licence in islington
- islington.gov.uk: property licensing fees (PDF)
- islington.moderngov.co.uk: ieDecisionDetails
- democracy.islington.gov.uk: mgConvert2PDF
- publicnoticeportal.uk: 6a8ffd291f34326c1cc206cc
Additional HMO licence
In forceMedium confidenceLondon Borough of Islington Designation of an Area for Additional Licensing of Houses in Multiple Occupation 2025
- Area
The entire district of the London Borough of Islington (map in Appendix A of the designation).
- Runs
- 1 February 2026 to 31 January 2031
- Fee
Published standard fee: £900
Mandatory and additional shared HMOs: Part A £500 + Part B £400 plus £100 per letting = £900 plus £100 per letting (letting fee capped at 21 lettings). Part B discounts: £75 accredited, £50 EPC A-C, £25 renewal. standard_gbp is the fixed element only. The section 257 building-level tariff is shown separately below; it must not be substituted for this shared-HMO tariff or added automatically to it.
- Who needs one
- HMOs occupied by three or four persons in two or more households meeting the standard, self-contained flat or converted building tests (or subject to an HMO declaration) that are not mandatory-licensable. The separately listed section 257 component concerns the converted building as a whole, not every flat occupied by one household.
- Exemptions
- Schedule 14 buildings; HMOs under Interim/Final Management Orders; s62 temporary exemptions; mandatory HMOs. Section 257 converted buildings are covered only by the separate building-level component below, subject to its ownership, rental, conversion and flat-count restrictions; converted buildings of no more than two flats are excluded from that component.
How we checked this
Designation made 30 October 2025 by the Corporate Director for Homes and Neighbourhoods under delegated power, after Executive agreement, citing the General Approval 2024. In force from 12.00am on 1 February 2026 until 11.59pm on 31 January 2031. Online applications opened 1 November 2025. The signed council-hosted designation and its borough map were fetched on 2 November 2026; the earlier London Landlord Accreditation Scheme republication is retained as a supporting source. The council's current licence-type page describes the smaller-HMO scheme consistently, and the signed designation retains the section 257 single-ownership/private-rental restrictions and excludes converted buildings containing no more than two flats. Executive minutes for 23 October 2025, item 417, now accessible on democracy.islington.gov.uk, confirm approval of the additional renewal and seven-ward selective expansion, with separate designation instruments determining commencement and scope. Section 257 conditions (Feb 2026): islington.gov.uk. Renews the 2020 borough-wide designation without a gap. The shared-HMO and section 257 entries separate the property categories within the same designation. They are not instructions to obtain two licences for the same premises; confirm with the council any separately licensable HMO flat within a converted building.
Sources
- islington.gov.uk: lbi additional hmo licensing designation 2026 (PDF)
- londonlandlords.org.uk: The London Borough of Islington Designation of an Area for Additional Licensing of Houses in Multiple Occupation 2025
- islington.gov.uk: property licensing
- islington.gov.uk: how to apply for a property licence in islington
- islington.gov.uk: property licensing fees (PDF)
- democracy.islington.gov.uk: ieListDocuments
Additional HMO licence
In forceMedium confidenceIslington additional HMO licensing 2026-2031 (section 257 converted buildings)
- Area
The entire district of the London Borough of Islington (map in Appendix A of the designation).
- Runs
- 1 February 2026 to 31 January 2031
- Fee
Published standard fee: £800
The council fees PDF section 3 separately prices a section 257 HMO at £800 per building: Part A £450 plus Part B £350, before any applicable discounts. The application page fetched on 2 November 2026 also states £800 for the whole building. This is the building-level row, not £900 plus a per-letting charge and not a fee for every individual flat. The PDF marks this row minus any discounts, with general discount eligibility conditions; do not assume an automatic award or that a separate flat or other application shares the same charge.
- Who needs one
- Section 257 HMOs: buildings converted into self-contained flats where the conversion work did not and still does not meet the appropriate Building Regulations standards (1991 or later, as applicable), and fewer than two-thirds of the flats are owner-occupied. Islington further limits this designation to buildings with more than two flats where all accommodation units are privately rented and the building and units are in the same ownership. Mixed-use buildings and buildings above non-residential premises can be included. This component concerns the building as a whole, not an ordinary single-household home or each individual flat.
- Exemptions
- Converted buildings containing no more than two flats; buildings failing the section 257 conversion-standards or owner-occupation test; buildings where not all accommodation units are privately rented or the building and units are not in the same ownership; Schedule 14 buildings; Interim/Final Management Orders; s62 temporary exemptions; mandatory-licensable HMOs.
How we checked this
This is the section 257 converted-building component of the same 2025 additional designation, shown separately from ordinary shared houses and flats. Signed designation paragraph 5(d) requires all units to be privately rented and the building and units to be in the same ownership; paragraph 6(e) excludes section 257 buildings of no more than two flats. The national section 257 definition additionally requires conversion work that did not and still does not meet the appropriate building standards and fewer than two-thirds of flats to be owner-occupied; the council planning page repeats those statutory tests. Borough-wide geography, statutory exemptions and designation dates are unchanged: 12.00am on 1 February 2026 to an explicit 11.59pm on 31 January 2031. The separate section 257 conditions apply to the converted building; the shared-HMO entry retains the HMO conditions. A single household in one flat does not prove that the building qualifies. These entries are alternative property-category checks, not an instruction to pay twice for the same premises; ask the council about any separately licensable HMO flat in the building.
Sources
- islington.gov.uk: lbi additional hmo licensing designation 2026 (PDF)
- londonlandlords.org.uk: The London Borough of Islington Designation of an Area for Additional Licensing of Houses in Multiple Occupation 2025
- islington.gov.uk: property licensing
- islington.gov.uk: how to apply for a property licence in islington
- islington.gov.uk: property licensing fees (PDF)
- democracy.islington.gov.uk: ieListDocuments
- islington.gov.uk: planning permission and building control for hmos
- legislation.gov.uk: 257
- islington.gov.uk: s257 conditions feb 2026 (PDF)
Mandatory HMO licence
In forceMandatory HMO licensing (Housing Act 2004 Part 2)
- Area
National scheme, applies across the borough.
- Fee
Published standard fee: £900
£900 plus £100 per letting (Part A £500; Part B £400 + £100 per letting, letting fee capped at 21). Large student accommodation developments: £900 plus £35 per letting. Part B discounts as for other schemes. standard_gbp is the fixed element only.
- Who needs one
- Houses or flats with 5 or more unrelated people in 2 or more households sharing a kitchen, bathroom or toilet, including buildings of bedsits or non-self-contained flats.
How we checked this
A shorter licence may be issued where a property operated unlicensed beforehand.
Additional HMO licence
EndedLondon Borough of Islington Designation of an Area for Additional Licensing of Houses in Multiple Occupation 2020
- Area
Entire London Borough of Islington.
- Runs
- 1 February 2021 to 31 January 2026
- Fee
Not yet confirmed
Scheme ended; replaced by the 2025 designation.
- Who needs one
- All s254 HMOs occupied by three or more persons not of the same household (including flats in purpose-built blocks of any height), and s257 HMOs (pre-1991 Building Regulations conversions where all flats are privately rented and under single freehold ownership), other than mandatory HMOs.
- Exemptions
- Mandatory HMOs; HMOs registered and managed under an approved s233 code of practice.
How we checked this
Made 22 October 2020. The designation says it 'shall cease to have effect on 1 February 2026', the same day the 2025 designation came into force at 12.00am, so end_date is 31 January 2026, its last day in force.
Islington's HMO register
Every council keeps a public register of the HMOs it has licensed. The council publishes it as a register you can search online. It lists licensed HMOs only, so a shared house that is missing from it may still need a licence.
The page still offers 'Search for HMO licences' ('find current HMO licences in Islington'). On 23 November 2026 that link redirected to the property-licensing landing page; the council's licensing portal hosts the 'Landlord licence public register' search at https://propertylicensing.islington.gov.uk/public-register.
Islington's HMO register on the council's website
Checked 23 November 2026
Article 4 for house shares
We found no Article 4 direction on house shares in Islington.
Civil penalty policy
We have not confirmed the current text of Islington's civil penalty policy.
The council's current 'If you do not have a licence' page says that an unlicensed property can lead to prosecution with an unlimited fine, a fine up to £40,000, a shorter licence, rogue-landlord database entry or a banning order; it also says tenants can apply to recover some or all of their rent. Source: islington.gov.uk . The earlier licensing-page copy recorded on 14 October 2026 referred to up to 24 months' rent and an 'Enforcement and Prosecution Policy and Fixed Penalty Charging policy'; these details are not repeated on the current page. A current housing civil penalty calculation matrix and RRA-specific adoption or implementation evidence remain unconfirmed. The 2026 selective designation says penalties 'currently can be up to £40,000', while the October 2025 additional designation retains pre-RRA wording of up to £30,000. A statutory maximum or current webpage alone does not verify a local matrix. On 10 November 2026 the unlicensed-property page still says 'fine you up to £40,000', but the council's 'What happens after you apply for a licence' page (islington.gov.uk) still says enforcement 'could include a financial penalty of up to £30,000 or an unlimited fine'.
Consultations
We found no consultations when we researched Islington.
Not yet confirmed
We could not settle these points when we researched Islington. Check them with the council before you rely on them.
- Not yet confirmed
A current housing civil penalty matrix and its Renters' Rights Act adoption or implementation evidence were not recovered in this scoped pass (rechecked 3 November 2026: the 'If you do not have a licence' page still gives prosecution with an unlimited fine or a fine up to £40,000 and links no calculation policy; rechecked again 10 November 2026 with the same wording and no linked policy). The current unlicensed-property page gives the £40,000 maximum but does not link a calculation policy. The earlier 14 October record's democracy access limitation no longer applies to the 23 October 2025 Executive item, which was read on 2 November 2026; that historical licensing decision does not establish a current RRA-specific penalty matrix.
- Not yet confirmed
The public licensing page lists a May 2024 standalone set of selective conditions. For the seven-ward designation starting 23 November 2026 use the Executive-approved Appendix 3 in the combined appendices. The Executive delegated future changes to the corporate director. Confirm any later variations against the issued licence.
- Not yet confirmed
Article 4: the council's HMO planning page says there are 'currently no planning restrictions on using a family home as an HMO for less than seven people'. No Islington C3 to C4 Article 4 entry was found on planning.data.gov.uk. Rechecked 10 November 2026: the council HMO planning page wording is unchanged; planning.data.gov.uk returned HTTP 503 and was unavailable for a fresh check.
- Not yet confirmed
HMO fee wording: the how-to-apply page (3 November 2026) says mandatory and additional HMO licences cost '£900 plus £100 for each bedroom', while the fees PDF charges '£900 plus £100 per letting' (capped at 21 lettings) with 'letting' defined in its section 6. The PDF tariff is recorded; confirm with the council how a letting is counted. Both wordings unchanged on 10 November 2026. Both wordings unchanged again on 23 November 2026.
- Not yet confirmed
Penalty maximum conflict on the council's own pages (10 November 2026): 'If you do not have a licence' says 'fine you up to £40,000', while 'What happens after you apply for a licence' says 'a financial penalty of up to £30,000'. The 2026 selective designation says up to £40,000. Confirm which applies and whether the latter page is stale pre-Renters' Rights Act copy. Rechecked 23 November 2026: both pages unchanged ('fine you up to £40,000' versus 'a financial penalty of up to £30,000', with rent repayment 'for a period of up to 12 months').
- Not yet confirmed
The London Landlord Accreditation Scheme republication of the 2025 additional designation (supporting source only) returned HTTP 200 on 10 November 2026 but no longer displays the article text; the council-hosted signed designation remains the primary source and was re-read the same day. Rechecked 23 November 2026: HTTP 200 with the same missing article text.
- Not yet confirmed
islington.moderngov.co.uk/ieDecisionDetails.aspx?Id=2277 returned HTTP 403 on 23 November 2026; the same decision (Id 2277) was read on democracy.islington.gov.uk. The Executive forward-plan page (democracy.islington.gov.uk/mgListPlans.aspx?RPId=217) also returned HTTP 403, so future key decisions (for example on the Canonbury and Clerkenwell work noted in the October 2025 decision) were checked only through published Executive agendas and delegated decisions.
The landlord register in Islington
The national landlord register is separate from council licensing: every landlord letting a home in Islington on an assured or regulated tenancy will need to register themselves and each home. Islington is in London. These dates are planned and the regulations are still in draft. Read about the register
- London opens
- Early registration from 15 Dec 2026
- Deadline
- Announced fee
- £65per property, every year
Get an email when London opens
Assess a rental property in Islington
Check the postcode and household free. A paid assessment explains which schemes may apply and which facts the council still needs.