Give tenants the gas safety record (cross-reference)
Give existing tenants a copy of the gas safety record within 28 days of each check, and new tenants the latest record before they move in.
- Status
- In force
- Penalty
- Criminal offence
- Topic
- Safety
Who it applies to
The property has gas appliances or flues the landlord must maintain (cross-reference only; the property-standards rules cover the annual check).
What you must do
Give a copy of the record to each existing tenant within 28 days of the check, and the last record to any new tenant before they occupy (tenancies of 28 days or less may display it instead).
- Deadline
Within 28 days of the certificate being issued
New tenants: before occupation.
Evidence to keep
- Gas safety record
- Proof of delivery to each tenant
If you do not comply
- Criminal offence
- Yes, you can be prosecuted
- Other consequences
- Enforced by HSE; see property-standards rules.
The law
Official guidance
Notes
Cross-reference only: the substantive duties are modelled in property.json (gas-safety-record-existing-tenants, gas-safety-record-new-tenants); de-duplicate when evaluating. The written statement of terms must also explain the landlord's gas safety duties (SI 2026/324 Schedule para 15).
Other safety rules
- Annual gas safety check by a Gas Safe registered engineerIn force since 3 Oct 1998
Have each relevant gas appliance and flue safety-checked by a Gas Safe registered engineer within 12 months of installation and then at least every 12 months. For a new lease, the statutory timing rule allows the first check of a newly installed appliance or flue to fall after the lease starts.
- Keep gas fittings and flues in a safe conditionIn force since 3 Oct 1998
Between annual checks you must keep the gas appliances, pipework and flues you are responsible for safe, and act promptly on any defect found.
- Keep gas safety recordsIn force since 6 Apr 2018
Keep each gas safety record until two further checks have been made on that appliance or flue, and make it available to occupiers on request.
- Give existing tenants the gas safety record within 28 daysIn force since 3 Oct 1998
After each annual gas check, give a copy of the record to every existing tenant within 28 days.
- Give new tenants the gas safety record before they move inIn force since 3 Oct 1998
A new tenant must receive a copy of the latest gas safety record before they occupy the property.
- Electrical installation inspection and test at least every 5 yearsIn force since 1 Jun 2020Fine up to £40,000
Before a new tenancy, check that the fixed electrical installation has a valid inspection report. A qualified person must inspect and test at least every 5 years, or sooner if the report requires it.
- Give existing tenants the electrical report within 28 daysIn force since 1 Jun 2020Fine up to £40,000
After each electrical inspection, give a copy of the report to each existing tenant within 28 days.
- Give new tenants the electrical report before they move inIn force since 1 Jun 2020Fine up to £40,000
A new tenant must receive a copy of the most recent electrical report before occupying the property.
- Give prospective tenants the electrical report within 28 days of a written requestIn force since 1 Jun 2020Fine up to £40,000
If a prospective tenant asks in writing for the electrical report, you must supply it within 28 days.
- Give the council the electrical report within 7 days of a written requestIn force since 1 Jun 2020Fine up to £40,000
If the council asks in writing for the electrical report, you must send it within 7 days.
- Keep the electrical report and pass it to the next inspectorIn force since 1 Nov 2025Fine up to £40,000
Keep each electrical report until the next inspection is due or done, and give a copy to the person doing the next inspection.
- Complete electrical remedial or investigative work within 28 daysIn force since 1 Jun 2020Fine up to £40,000
If the electrical report records C1 or C2 defects, have the work done by a qualified person within 28 days of the inspection, or sooner if the report says so. For inspections before 30 November 2026, FI (further investigation) items must also be dealt with in that time.
- Send written confirmation of electrical remedial work to tenants and the council within 28 daysIn force since 1 Jun 2020Fine up to £40,000
After remedial work (or investigative work required by a report from an inspection completed before 30 November 2026), get written confirmation from a qualified person and send it, with the original report, to the tenants and the council within 28 days of completion.
There must be a smoke alarm on each storey that has a room used wholly or partly as living accommodation, including bathrooms and toilets, throughout the tenancy.
- Carbon monoxide alarm in rooms with a fixed combustion applianceIn force since 1 Oct 2022Fine up to £5,000
Any room used as living accommodation that contains a fixed combustion appliance (other than a gas cooker), such as a boiler, gas fire or wood burner, must have a carbon monoxide alarm.
- Check smoke and CO alarms work on the day a new tenancy beginsIn force since 1 Oct 2015Fine up to £5,000
On the first day of each new tenancy, check that every required smoke and carbon monoxide alarm is in proper working order.
- Repair or replace faulty smoke or CO alarms after a tenant reportIn force since 1 Oct 2022Fine up to £5,000
If a tenant reports that an alarm is not working, check it and repair or replace it as soon as reasonably practicable.
Landlords must assess the risk of tenants being exposed to Legionella from the hot and cold water system and put simple controls in place. A test certificate is not required.
Upholstered furniture, beds, mattresses, pillows and cushions you provide in a let must meet the Furniture and Furnishings (Fire) (Safety) Regulations, which is normally shown by a permanent label.
Whoever manages an HMO must meet the HMO management regulations on contact details, fire safety, water, gas and electricity, common parts, living accommodation and waste, whether or not the HMO is licensed.
- HMO manager: send the gas safety certificate to the council within 7 days of a requestIn force since 6 Apr 2006Fine up to £40,000
If the council asks in writing, the HMO manager must send the latest gas safety certificate within 7 days.
Give existing tenants the EICR within 28 days of the inspection, new tenants before they move in, and prospective tenants within 28 days of a written request.